Complete project overview

MahaRERA · Registration filing
Project name
Sea Krest
Units
12 units
Mix
10 × 4 BHK · 1 × Duplex · 1 × Triplex
Carpet area
452–1227 sq mper-unit range, as filed
Floors
36
Parking
195 spaces
Land area
3,201 sq m
Sanctioned built-up
6,867 sq m

Timeline

RERA registeredJul 2023
Proposed completionDec 2027
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Excavation75%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

12 units across 4 batches
TypeArea sq mCount
Duplex9051
Triplex1,2271
4 BHK4911
4 BHK4529

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Sugee Developers Pvt. Ltd.

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
6Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
181 homeson the public record across 6 projects
26,239 sq mbuilt-up filed
8,822 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Sugee Developers Pvt. Ltd.— the full portfolio →

03

Location

MahaRERA · Registration filing
District
Mumbai City
Pincode
400030
Survey no.
S. No.52 (Part), Old C.S. No.160 (Part), New C.S. No.999 (Part)
North boundary
Sasmira Silk Mill
East boundary
Dr Annie Besant Road
South boundary
Building No 5
West boundary
Hill Slum
What’s nearby
Schools1 school within 500m · 6 educational institutions within 1km · College or university 82m away
HealthcareHospital 359m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 659m away · Gym or sports centre 1.1km away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 1.6km away · Mall 1.7km away
Getting around
Expressway 2.1 km · Dr Babasaheb Ambedkar Marg (Vincent Road)Primary road 93 m · Dr Annie Besant RoadRailway line 1.4 kmMetro station 108m away (Worli)8 bus stops within 500m
Water & environment
Water body 622 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

2,897 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,150 projects the radar draws within 6 km — every kind, every stage — 416 are residential projects still under way. This list keeps only those, and looks further out.

9 projects within 1 km — showing the nearest 6.

450 m awayResidential / Group Housing

Lodha Worli Residential Project

Lodha Developers Limited · WORLI · Mumbai City

Jan 2026registered
Jun 2033target completion
Scale195 flatsAuthorityMahaRERA
460 m awayResidential / Group Housing

AAKASA

TECHNO FRESHWORLD LLP · WORLI

Apr 2023registered
Dec 2027target completion
Scale33 flatsAuthorityMahaRERA
710 m awayResidential / Group Housing

The V Mansion

ROOF ABOVE REALTORS LLP · Mumbai City

Feb 2026registered
Dec 2030target completion
Scale88 flatsAuthorityMahaRERA
750 m awayResidential / Group Housing

Birla Niyaara Phase-2

Aditya Birla Real Estate Limited · Worli

Jan 2024registered
Mar 2029target completion
Scale148 flatsAuthorityMahaRERA
760 m awayResidential / Group Housing

Birla Niyaara Phase-1

Aditya Birla Real Estate Limited · Lower Parel

Nov 2021registered
Mar 2028target completion
Scale414 flatsAuthorityMahaRERA
850 m awayResidential / Group Housing

THE GRAND TOWER NO 1

SAMIR NARAIN BHOJWANI · LOWER PAREL

Jun 2024registered
Jan 2028target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.