HORIZON
Share

RAJSHREE CITY CENTRE

PR/GJ/SURAT/SURAT CITY/SUDA/CAA04157/EX1/230123 · GujRERA · https://gethorizon.in/projects/rajshree-city-centre-surat-city-r1fo4cft

01

Complete project overview

GujRERA · Registration filing
Project name
RAJSHREE CITY CENTRE
Units
241 units
Mix
241 × Shops
Carpet area
7–368 sq mper-unit range, as filed
Parking
382 spaces
Land area
3,610 sq m

Timeline

Project startedJun 2018
RERA registeredNov 2018
Proposed completionMar 2023
TodaySep 2026
Construction progress

92% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

241 units across 1 batch
TypeArea sq mCount
Shops21241

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

RAJSHREE CORPORATION

PARTNERSHIP FIRMPromoter type
Surat, GujaratBased in
1Projects
1City
2018–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Surat City
District
Surat
Pincode
395002
Address
CITY SURVEY NO. 3425/A/2/A/1, GAMTAL AREAWARD NO.02 (SAGRAMPURA)
What’s nearby
SchoolsNearest school 1.4km away · Library 1.2km away
HealthcareHospital 132m away · 7 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.1km away
ShoppingSupermarket 1.3km away · Mall 1.3km away · Bank 915m away
Getting around
Expressway 690 mPrimary road 1.5 km · Athwa Gate CircleRailway line 2.1 kmMetro station 638m away (Kadarsha Ni Nal)Limited bus connectivity nearby
Water & environment
Water body 406 m · Gopi Talav
distances only — not a flood assessment
Land, title & encumbrance
MortgageLoan outstanding to THE SURAT PEOPLES CO OP BANK LTD · ₹8.00 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹26.13 Cr declared to build 241 flats. What that works out to:

₹3.64 Lakh – ₹92.04 Lakhdeclared unit pricerange on the filing — not a live asking price
₹10.84 Lakhdeclared cost per flatall-in — land + construction
29%of the cost is land₹1,951/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

GujRERA · Approved building plan

Surat Municipal Corporation

Municipal / Corporation
Building Permitapproved 29 Nov 2018 · 7 yrs ago

The promised possession date (31 Mar 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Surat Municipal Corporation

Municipal Corporation

Has approved 1,566 RERA projectsabout 1 in 11 in Gujarat.

an apartments market85% apartments · 15% plotted layouts. Apartments like yours are this body's core business.

Builders
1,275
On record
2,64,009 flats · 16,727 plots
Reach
8 talukas
Since
2005

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

180 commercial projects still under way within 25 km. Step out ring by ring:

Of the 654 projects the radar draws within 6 km — every kind, every stage — 74 are commercial projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

510 m awayCommercial

UNITED SPARSH

UNITEDDREAMZ · Surat City

Apr 2026registered
Dec 2029target completion
Price band₹29.74 Lakh–₹2.05 CrScale35 flatsAuthorityGujRERA
710 m awayCommercial

Majoris

MAJORIS INFRA LLP · Surat City

Sep 2023registered
Mar 2027target completion
Price band₹36.20 Lakh–₹1.12 CrScale11 flatsAuthorityGujRERA
990 m awayCommercial

NEXUS

SWASTIK VENTURES · Surat City

Nov 2025registered
Dec 2028target completion
Price band₹48.48 Lakh–₹1.21 CrScale75 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.