HORIZON
Share

RAMAN TARA HEIGHTS

P51900011462 · MahaRERA · https://gethorizon.in/projects/raman-tara-heights-mumbai-city-hx884l4j

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
RAMAN TARA HEIGHTS
Units
22 units
Mix
10 × Residential · 9 × Office · 2 × Nr · 1 × Meter Room
Carpet area
6–44 sq mper-unit range, as filed
Floors
11
Parking
1 spaces
Land area
105 sq m
Sanctioned built-up
452 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2017
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

22 units across 14 batches
TypeArea sq mCount
Office91
Office81
Office141
Office191
Office111
Office101
Office91
Office191
Residential295
Residential155
Meter Room61
Office121
Nr261
Nr441

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SURENDRA MODY AND OTHERS

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2017–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400003
Survey no.
685
North boundary
CS NO 684
East boundary
CS NO 702
South boundary
CS NO 686
West boundary
NARAYAN DHURU STREET
What’s nearby
Schools1 school within 500m · College or university 1.8km away · Library 1.3km away
HealthcareHospital 156m away · Clinic within 2km · Pharmacy within 1km
LifestylePark 598m away · Gym or sports centre 1.7km away · 25+ restaurants and cafes within 1km
ShoppingSupermarket 853m away · Mall 532m away · Convenience store within 1km
Getting around
Expressway 2.0 km · Dr Babasaheb Ambedkar MargPrimary road 162 m · J. J. FlyoverRailway line 323 m · Central Railway (Express)Railway station 319m away (Masjid)11 bus stops within 500m
Water & environment
Water body 549 m · Juma Masjid Pond
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

2,237 residential projects still under way within 25 km. Step out ring by ring:

Of the 581 projects the radar draws within 6 km — every kind, every stage — 199 are residential projects still under way. This list keeps only those, and looks further out.

16 projects within 1 km — showing the nearest 6.

360 m awayResidential / Group Housing

MUSTAFA ARCADE

AAS INFRA CONSTRUCTION · Mumbai City

Aug 2026registered
Jun 2030target completion
Scale67 flatsAuthorityMahaRERA
380 m awayResidential / Group Housing

21, Baugh-E-Hasnain

Amex Developers Private Limited · Mumbai City

Jan 2026registered
Dec 2033target completion
Scale134 flatsAuthorityMahaRERA
440 m awayOthers

QAMAR E BANI HASHIM

COMMERCIAL DEVELOPERS · Mumbai City

Mar 2026registered
Dec 2028target completion
Scale109 flatsAuthorityMahaRERA
480 m awayOthers

Lotus

Shreem Reality · Mandvi

Nov 2024registered
Feb 2028target completion
Scale172 flatsAuthorityMahaRERA
480 m awayOthers

REHMAT PARK

Oriental Contractors Private Limited · BHULESHWAR C WARD

Aug 2024registered
Oct 2028target completion
Scale243 flatsAuthorityMahaRERA
500 m awayResidential / Group Housing

ZAHRA RESIDENCY

ALLIANCE BUILDERS AND DEVELOPERS · Dongri

Apr 2024registered
Dec 2026target completion
Scale64 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.