HORIZON
Share

orsam angan

P51900007788 · MahaRERA · https://gethorizon.in/projects/orsam-angan-mumbai-city-qgmgrdz1

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
orsam angan
Units
18 units
Mix
10 × 2 BHK · 5 × 1 BHK · 2 × 3 BHK · 1 × Shop
Carpet area
37–70 sq mper-unit range, as filed
Floors
27
Parking
33 spaces
Land area
426 sq m
Sanctioned built-up
3,898 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

18 units across 16 batches
TypeArea sq mCount
2 BHK531
1 BHK471
1 BHK491
2 BHK571
2 BHK551
2 BHK532
Shop401
3 BHK701
1 BHK412
2 BHK501
2 BHK561
2 BHK561
1 BHK371
2 BHK531
3 BHK701
2 BHK511

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

GOLD PLAZA DEVELOPERS PVT LTD

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
3Projects
1City
2017–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
434 homeson the public record across 3 projects
13,381 sq mbuilt-up filed
2,701 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from GOLD PLAZA DEVELOPERS PVT LTD— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400009
Survey no.
15/1721
North boundary
JEVIRAJ BHANJI SHAH MARG
East boundary
KESHAVJI NAIK ROAD
South boundary
MULJI DEVJI BUILDING
West boundary
SERVICES ROAD 6MT
What’s nearby
Schools1 school within 500m · College or university 1.7km away · Library 1.7km away
HealthcareHospital 275m away · Clinic within 2km · Pharmacy within 1km
LifestylePark 723m away · 24+ restaurants and cafes within 1km
ShoppingSupermarket 1.2km away · Mall 810m away · Convenience store within 1km
Getting around
Expressway 1.7 km · Dr Babasaheb Ambedkar MargPrimary road 485 m · J. J. FlyoverRailway line 106 m · Mumbai-Pune RailwayRailway station 415m away (Masjid)8 bus stops within 500m
Water & environment
Water body 928 m · Juma Masjid Pond
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

2,281 residential projects still under way within 25 km. Step out ring by ring:

Of the 609 projects the radar draws within 6 km — every kind, every stage — 208 are residential projects still under way. This list keeps only those, and looks further out.

14 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

21, Baugh-E-Hasnain

Amex Developers Private Limited · Mumbai City

Jan 2026registered
Dec 2033target completion
Scale134 flatsAuthorityMahaRERA
50 m awayResidential / Group Housing

MUSTAFA ARCADE

AAS INFRA CONSTRUCTION · Mumbai City

Aug 2026registered
Jun 2030target completion
Scale67 flatsAuthorityMahaRERA
100 m awayOthers

Lotus

Shreem Reality · Mandvi

Nov 2024registered
Feb 2028target completion
Scale172 flatsAuthorityMahaRERA
440 m awayResidential / Group Housing

One Marina

VALENCIA AND MISHAL VENTURES PVT LTD · Mumbai City

Feb 2019registered
Dec 2028target completion
Scale318 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

ZAHRA RESIDENCY

ALLIANCE BUILDERS AND DEVELOPERS · Dongri

Apr 2024registered
Dec 2026target completion
Scale64 flatsAuthorityMahaRERA
500 m awayResidential / Group Housing

Fatima Residency

M K ENTERPRISES · B.I.T chawl

Nov 2023registered
Dec 2027target completion
Scale106 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.