Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
18 units across 6 batches
BuildingTypeArea sq mCount
R.R ENCLAVE3 BHK2193
R.R ENCLAVE2 BHK1703
R.R ENCLAVE2 BHK1653
R.R ENCLAVE3 BHK1633
R.R ENCLAVE2 BHK1633
R.R ENCLAVE3 BHK2203
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.6km away · College or university 1.7km away · Library 1.3km away
HealthcareHospital 1.0km away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 941m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 947m away · Bank 836m away
Getting around
Expressway 1.9 kmPrimary road 1.5 kmRailway line 688 mRailway station 915m away (Patliputra)Limited bus connectivity nearby
Water & environment
River 1.9 kmCanal 2.6 km · Barun Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹4.44 Cr declared to build 18 flats. What that works out to:
₹24.67 Lakhdeclared cost per flatall-in — land + construction
₹3,184/sq ftof built-up area₹34,277/sq m
43%of the cost is land₹2,747/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~20 m of the recorded location until 2017; a building is first visible in 2018 and is about 18 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2018.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Bihar registration department
In Bihar it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Bihar's Minimum Value Register is in Horizon's record, but this project's mauja couldn't be tied to one thana — or its thana prices land by the katha, a unit whose size differs from district to district, so converting it would be a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RERA Bihar · Approved building plan
Building Permit
The promised possession date (31 Jul 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
RERA Bihar · public record
Complaints register
Not published. RERA Bihar doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Bihar
Litigation
None declared in this filing
Only what the builder declared, or what RERA Bihar records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Bihar, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
360 residential projects still under way within 25 km. Step out ring by ring:
Of the 788 projects the radar draws within 6 km — every kind, every stage — 221 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Bihar's published schedules.
06Planning authority
RERA Bihar: the approved building plan, as filed.
07Complaints & litigation
RERA Bihar's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/r-r-enclave-shahjadpur-patna-no96oy0s.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.