THE PALACE PHASE II SKYLINE
DMC ESTATE MANAGEMENT · Vadodara
SANGANI SKYZ
Timeline
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from SANGANI INFRASTRUCTURE INDIA PRIVATE LIMITED— the full portfolio →
₹46.35 Cr declared to build 240 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
What this number is — and isn’t
The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 655 RERA projects — 3.8% of Gujarat.
an apartments market — 98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
3 complaints
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | What | Date |
|---|---|---|
| GJ/CMP/NCQR/Vadodara/201026/0063 | Non-compliance · quarterly report | 26 Oct 2020 |
| CMP/Ahmedabad/201013/000267 | Complaint | 13 Oct 2020 |
| CMP/Ahmedabad/180705/000093 | Complaint | 5 Jul 2018 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
1,139 residential projects still under way within 25 km. Step out ring by ring:
Of the 579 projects the radar draws within 6 km — every kind, every stage — 228 are residential projects still under way. This list keeps only those, and looks further out.
6 projects within 1 km — showing the nearest 6.
DMC ESTATE MANAGEMENT · Vadodara
DMC ESTATE MANAGEMENT · Vadodara
ASPIRE ELITE · Vadodara
PAHAL BUILDTECH · Vadodara
MANGALAM BUILDCON · Vaghodia
SARVA ASSOCIATES · Vaghodia
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you