NOTE 1) TOTAL AREA OF THE PROJECT AS PER APPROVED SITE PLAN IS 954.55 SQ.YD., MULTIPLYING IT BY 9, IT BECOMES 8590.95 SQ.FT AND DIVIDING THE SAME BY 10.76 IT BECOMES 798.41 SQ.MTR, JDA HAS APPROVED ARCHITECT'S MAP BASED ON THE AFOREMENTIONED CALCULATION, HOWEVER WHILE TYPING BUILDING PERMISSION LETTER JDA OFFICER HAS MADE A CLERICAL ERROR IN COMPUTING AREA OF THE PROJECT AS THEY HAVE DIRECTLY CONVERTED SQ.YD. AREA OF 954.55 INTO SQ.MTR. THEREBY IT IS MENTIONED AS 798.10 SQ.MTR IN BUILDING SANCTION PLAN. THE MAPS, THE AREA CALCULATIONS, THE BUILDING DIMENSIONS ARE BASED ON ACTUAL SITE LOCATION AREA I.E., 798.41 SQ.MTR. AND THUS IT IS CONSIDERED FOR RERA PROJECT REGISTRATION AS WELL. ALSO, SUCH CALCULATION ERROR BEING BASED ON FORMULA ROUND OFF, IT IS IGONRED HEREWITH. KINDLY TAKE A NOTE.
Timeline
Construction startApr 2022
RERA registeredJul 2022
Proposed completionJun 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 573m away · 5 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 146 m · Jaipur Kishangarh ExpresswayPrimary road 2.9 kmMetro station 3.0km away (Manasarovar)3 bus stops within 500m
Water & environment
Water body 3.5 km · Fountain RD
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹8.95 Cr declared to build 24 flats. What that works out to:
₹37.29 Lakhdeclared cost per flatall-in — land + construction
₹2,502/sq ftof built-up area₹26,928/sq m
16%of the cost is land₹1,658/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 12 Jul 2022 · 4 yrs ago
The promised possession date (30 Jun 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
421 residential projects still under way within 25 km. Step out ring by ring:
Of the 491 projects the radar draws within 6 km — every kind, every stage — 140 are residential projects still under way. This list keeps only those, and looks further out.