As per Applicant request application w.r.t. Extension of Estimated Finished date and further to the approval of Hon'ble Chairman on 07-01-2020, the estimated finished date has been changed from 31-12-2018 to 30-09-2019.Therefore revised estimated finished date should be now read as 30-09-2019. Estimated finished date updated on 09-01-2020.
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
D-54 B, Madho Singh Road, Bani Park, Jaipur, Jaipur, 302016
Taluka
Jaipur
District
Jaipur
Pincode
302016
What’s nearby
Schools2 schools within 500m · 4 educational institutions within 1km
HealthcareHospital 83m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 972m away · 11+ restaurants and cafes within 1km
ShoppingSupermarket 1.2km away · Mall 446m away · Convenience store within 1km
Getting around
Expressway 1.8 km · Church roadPrimary road 56 m · Meera MargRailway line 1.6 kmMetro station 1.4km away (Sindhi Camp)4 bus stops within 500m
Water & environment
Water body 660 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹10.97 Cr declared. What that works out to:
43%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Building Permitapproved 30 Aug 2017 · 9 yrs ago
The promised possession date (30 Sep 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
414 residential projects still under way within 25 km. Step out ring by ring:
Of the 199 projects the radar draws within 6 km — every kind, every stage — 75 are residential projects still under way. This list keeps only those, and looks further out.