4 × 4 BHK TYPE 1 (101, 201,301.401) · 4 × 4 BHK TYPE 2 (102, 202,302,402) · 1 × 4 BHK TYPE 4 (502 with private terrace) · 1 × 4 BHK TYPE 3 (501 with private terrace)
Carpet area
116–118 sq mper-type range, as filed
Land area
502 sq m
Description
There is no visitors parking provision as per the approved maps.
Timeline
Construction startFeb 2022
RERA registeredJul 2023
Proposed completionFeb 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
10 units across 4 batches
BuildingTypeArea sq mCount
The Platinum homes4 BHK TYPE 4 (502 with private terrace)1161
The Platinum homes4 BHK TYPE 1 (101, 201,301.401)1184
The Platinum homes4 BHK TYPE 2 (102, 202,302,402)1164
The Platinum homes4 BHK TYPE 3 (501 with private terrace)1181
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.7 kmPrimary road 109 m · Sikar RoadRailway line 742 mMetro station 558m away (Ambabadi Metro (u/c))6 bus stops within 500m
Water & environment
Water body 651 m · Amanishah Nala
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹6.93 Cr declared to build 10 flats. What that works out to:
₹69.26 Lakhdeclared cost per flatall-in — land + construction
₹2,917/sq ftof built-up area₹31,398/sq m
21%of the cost is land₹2,640/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 29 Jul 2023 · 3 yrs ago
The promised possession date (28 Feb 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
414 residential projects still under way within 25 km. Step out ring by ring:
Of the 215 projects the radar draws within 6 km — every kind, every stage — 84 are residential projects still under way. This list keeps only those, and looks further out.
12 projects between 1 and 3 km — showing the nearest 6.