SHUBH MANGAL PRIME4 BHK TYPE 4 (601 with private terrace)1381
SHUBH MANGAL PRIME4 BHK TYPE 5 (602 with private terrace)1431
SHUBH MANGAL PRIME4 BHK TYPE 6 (603 with private terrace)1391
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RAJ-RERA · Registration filing
Address
D-89-B MEERA MARG BANI PARK, MEERA MARG, BANI PARK SCHEME JAIPUR, JAIPUR, Jaipur, Jaipur, 302016
Village
JAIPUR
Taluka
Jaipur
District
Jaipur
Pincode
302016
What’s nearby
Schools3 schools within 500m · 5 educational institutions within 1km
HealthcareHospital 324m away · 8 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · 52+ restaurants and cafes within 1km
ShoppingSupermarket 927m away · Mall 598m away · Convenience store within 500m
Getting around
Expressway 1.4 km · Church roadPrimary road 220 mRailway line 1.0 kmMetro station 1.0km away (Sindhi Camp)2 bus stops within 500m
Water & environment
Water body 700 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹14.46 Cr declared to build 18 flats. What that works out to:
₹80.33 Lakhdeclared cost per flatall-in — land + construction
₹2,915/sq ftof built-up area₹31,382/sq m
20%of the cost is land₹3,157/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 13 Jul 2023 · 3 yrs ago
The promised possession date (11 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
416 residential projects still under way within 25 km. Step out ring by ring:
Of the 220 projects the radar draws within 6 km — every kind, every stage — 80 are residential projects still under way. This list keeps only those, and looks further out.