Sunrise Apt.

P99000008059 · MahaRERA · https://gethorizon.in/projects/sunrise-apt-saravali-palghar-ylel8je7

01

Complete project overview

MahaRERA · Registration filing
Units
42 units
Floors
11
Buildings
6
Parking
16 spaces
Land area
2,064 sq m
Sanctioned built-up
2,014 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2019
TodaySep 2026
Construction progress
Podiums0%
OC-readiness0%
Water Supply0%
Fire protection an…0%
Internal Roads & F…75%
Flat fit-out90%
Electrical meter r…90%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Stairs & lifts100%
External finishes100%
Sewerage (Chamber,…100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Paradise Developers

PartnershipPromoter type
Palghar, MAHARASHTRABased in
7Projects
5Cities
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
69 homes · 272 plotson the public record across 7 projects
3,604 sq mbuilt-up filed
2,995 sq mland declared
₹15.16 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
SanawadTown & Country Planning (DTCP)3 of 5 projects
Gram PanchayatGram Panchayat1 of 5 projects
Maharashtra Industrial Development Corporation (MIDC)Development Authoritythis project1 of 5 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Paradise Developers— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Saravali
Taluka
Palghar
District
Palghar
Pincode
401505
Survey no.
RC-49
North boundary
RC-50
East boundary
Azad Nagar
South boundary
RC-48
West boundary
15 m wide road
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 498m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 590 m · Boisar-Palghar RoadRailway line 820 mRailway station 1.7km away (Boisar)Limited bus connectivity nearby
Water & environment
Water body 2.1 kmCanal 2.4 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹20,903per sq yd
₹25,000per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Saravali”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Maharashtra Industrial Development Corporation (MIDC)

Development Authority
Building Permit
Survey no. RC-49

The promised possession date (11 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Maharashtra Industrial Development Corporation (MIDC)

Metropolitan / development authority

Has approved 156 RERA projects0.8% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
118
On record
3,504 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

298 residential projects still under way within 25 km. Step out ring by ring:

Of the 247 projects the radar draws within 6 km — every kind, every stage — 78 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

480 m awayResidential / Group Housing

OSTWAL DREAM LAND PHASE - II

SHREE OSTWAL BUILDERS LTD · Boisar · Palghar

Jun 2019registered
Jul 2026target completion
Scale187 flatsAuthorityMahaRERA
740 m awayResidential / Group Housing

OSTWAL PARAMOUNT

SHREE OSTWAL BUILDERS LTD · Boisar · Palghar

Nov 2024registered
Dec 2029target completion
Scale81 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.