HORIZON
Share

THE RAINBOW

T1/OL/093/2021 · K-RERA · https://gethorizon.in/projects/the-rainbow-vilappil-thiruvananthapuram-o32weebf

01

Complete project overview

K-RERA · Registration filing
Project name
THE RAINBOW
Plots
73 plots
Mix
28 × 1BHK · 23 × 2BHK · 22 × Bangalow / Villas
Booked
51 of 73 filed sold/bookedas declared in the RERA filing
Buildings
4
Land area
8,690 sq m
Floor area
10,734 sq m
Description
THE RAINBOW

Timeline

Project startedApr 2018
RERA registeredMar 2021
Proposed completionSep 2021
TodaySep 2026
Construction progress

85% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings50%
Electrical Fittings50%
Installation of lifts, water pumps etc75%
Fire Fighting Fittings and Equipment75%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc75%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings95%
The external plumbing and external plastering95%
Completion of terraces floor each building95%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

22 of 73 available
TypeArea sq mAvailable
Bangalow / Villas1,5711 of 22
1BHK1,73617 of 28
2BHK1,5994 of 23

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

ALIVE LIFESPACES

PartnershipPromoter type
Thiruvananthapuram, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
VILLAPILSALA ROAD
Village
VILAPPIL
Taluk
KATTAKADA
District
Thiruvananthapuram
Pincode
695573
Survey no.
242/9-1,241/5-1-1,244/3-1, 244/3-5,244/3-6,244/3-7, 242/5,
Patta no.
33155, 33321, 33830
What’s nearby
SchoolsNearest school 1.4km away · Library 958m away
HealthcareHospital 2.0km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 783m away · Convenience store within 1km
Getting around
No metro or railway within 5kmBus stop within 1km
Water & environment
Water body 549 mRiver 2.6 km · Karamana RiverCanal 4.0 km · aruvipara canal
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹331per sq yd
₹396per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Vilappil”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Villapil Grama Panchayat

Grama Panchayat
approved 27 Sep 2017 · 9 yrs ago
Layout Permit no. A4-2345/17Survey no. 242/9-1,241/5-1-1,244/3-1, 244/3-5,244/3-6,244/3-7, 242/5,

The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan A4-2345/17 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Grama Panchayat

A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts about 1 in 6 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

50 plotted projects still under way within 25 km. Step out ring by ring:

Of the 24 projects the radar draws within 6 km — every kind, every stage — 6 are plotted projects still under way. This list keeps only those, and looks further out.

2 projects within 3 km — showing the nearest 2.

VILAPPILVillas (Plots & Buildings)

NAKSHATRA PRAVASI

MIDHUN MARKOSE BUILDERS AND DEVELOPERS INDIA PVT LTD

Dec 2022registered
Apr 2027target completion
Government Guidance Rate₹441/sq ydScale41 plotsAuthorityK-RERA
VILAPPILPlots

MANNALIL HILLS

MANALIL REALTORS

Jan 2025registered
Sep 2026target completion
no escrow declaredGovernment Guidance Rate₹3,311/sq ydAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.