01

Complete project overview

ORERA · Registration filing
Units
23 units
Carpet area
51–60 sq mper-unit range, as filed
Building type
S+4
Parking
17 spaces
Land area
789 sq m
Plan valid until
31 May 2026
Amenities
9 filed — Water Supply, Fire Fighting Facility, Emergency Evacuation Services, Elevators, Community Center, Plantation Area/No. …
Description
(Construction of proposed [S+4] Storied Residential apartment building, No. of Residential Units-23)

Timeline

Construction startOct 2023
Proposed completionJan 2026
TodaySep 2026

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitCarpet sq m
1011st Floor57.54
1021st Floor59.66
1031st Floor55.74
1041st Floor55.75
1051st Floor51.45
1061st Floor57.54
2012nd Floor57.54
2022nd Floor59.66
2032nd Floor55.74
2042nd Floor55.75
2052nd Floor51.45
2062nd Floor57.54
3013rd Floor57.54
3023rd Floor59.66
3033rd Floor55.74
3043rd Floor55.75
3053rd Floor51.45
3063rd Floor57.54
4014th Floor57.54
4024th Floor59.66
4034th Floor55.74
4044th Floor55.75
4054th Floor57.54

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.

02

Builder’s track record

ORERA · Builder registration

VISION REACH INFRA PRIVATE LIMITED

Private Limited CompanyPromoter type
Cuttack, OdishaBased in
1Projects
1City
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

ORERA · Registration filing
District
Cuttack
Pincode
754029
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.1km away
HealthcareHospital 191m away · 8 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · 8 restaurants and cafes within 1km
ShoppingSupermarket 50m away · Mall 665m away · Bank 273m away
Getting around
Expressway 1.8 km · Service RoadPrimary road 678 m · Canal RoadRailway line 1.6 kmRailway station 1.6km away (Cuttack Junction)Bus stop within 1km
Water & environment
Water body 212 m
distances only — not a flood assessment
Land, title & encumbrance
Land parcels1 parcel · 789 sq m total
Land tenure1 of 1 parcel held under a Power of Attorney / development agreement — not a registered sale deed to the promoter
VillageKhandagara
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Odisha IGR — benchmark valuation

In Odisha it’s called the benchmark value.

₹2,066per sq yd
₹2,471per sq m
Which rate
residential
Matched to
The rate published for the village of “KHANDAGARH”.

What this number is — and isn’t

  • The minimum value Odisha’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

ORERA · Approved building plan

Gram Panchayat

Gram Panchayat
Building Permit

The promised possession date (31 Jan 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

See every project approved by ORERA

07

Other projects nearby

The register · within 25 km

332 residential projects still under way within 25 km. Step out ring by ring:

Of the 54 projects the radar draws within 6 km — every kind, every stage — 26 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

630 m awayResidential

Satyajay Enclave

Satyajay Infra Pvt Ltd. · Cuttack Sadar · Cuttack

PossessionJan 2029Government Guidance Rate₹2,893/sq ydScale16 flats
790 m awayMixed Development

MM BRUNDABANA TOWER

M/S. MM ENGINEERS & CONSULTANTS · Cuttack

PossessionMar 2027Scale21 flatsRegistrationvalid to Jan 2027
790 m awayResidential

MM RIVER VIEW PHASE-II

M/S. MM ENGINEERS & CONSULTANTS · CUTTACK · Cuttack

PossessionDec 2030Government Guidance Rate₹7,438/sq ydScale80 flats
930 m awayMixed Development

NUA GHARA

SCHEME-ART REAL ESTATE PRIVATE LIMITED · Cuttack

PossessionMay 2027Scale61 flatsRegistrationvalid to May 2027

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — ORERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — ORERA does not publish a complaints register. This read cannot speak to them either way.