Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
BDA - Bangalore Development AuthorityUrban Development Authoritythis project1 of 2 projects
BMRDA - Bangalore Metropolitan Region Development AuthorityUrban Development Authority1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Sy No. 67/7, Singasandra Village, , Begur Hobli, Bangalore South taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560068
What’s nearby
Schools3 schools within 500m · 12 educational institutions within 1km · Kindergarten within 500m
HealthcareHospital 669m away · 2 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · 15+ restaurants and cafes within 1km
ShoppingSupermarket 255m away · Convenience store within 500m · Bank 249m away
Getting around
Expressway 806 m · Hosur RoadPrimary road 4.5 km · Silkboard Double Decker FlyoverMetro station 686m away (Singasandra)Bus stop within 500m
Water & environment
Water body 284 m · Begur Kere
distances only — not a flood assessment
Land, title & encumbrance
LandJoint development (JDA) — built on the owner’s land by agreement
ConversionConverted to non-agricultural
MortgageNone declared on the project / land
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹13.17 Cr declared to build 28 plots. What that works out to:
₹47.04 Lakhdeclared cost per plotall-in — land + construction
83%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~40 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Feb 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Karnataka registration department
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan BDA/TPM/PRL-28/2020-21/1119/2021-22 on the approving authority’s portal to confirm the approval.
The approving body, at scale
BDA
Urban Development Authority · Bangalore Development Authority
Has approved 830 RERA projects — about 1 in 11 in Karnataka.
an apartments market — 73% apartments · 27% plotted layouts. Layouts like yours are the smaller share here — this body mostly approves apartments.
Builders
626
On record
82,843 flats · 16,515 plots
Reach
13 taluks
Since
2017
More apartment-heavy than Karnataka overall — 73% apartments here vs 62% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to RERA Karnataka
Litigation
Declared free of litigation
The builder's own declaration at registration — not a court's or RERA Karnataka's finding. A flagged line is worth checking with RERA Karnataka.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
185 plotted projects still under way within 25 km. Step out ring by ring:
Of the 474 projects the radar draws within 6 km — every kind, every stage — 15 are plotted projects still under way. This list keeps only those, and looks further out.
3 projects between 1 and 3 km — showing the nearest 3.
1.8 km awayPlotted Development
Singasandra AEHBCS Layout
The Aircraft Employees House Building Co-operative society Limited · Bengaluru South
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Karnataka's published schedules.
06Planning authority
RERA Karnataka: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RERA Karnataka's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/white-house-avenue-bengaluru-south-4ltgykcz.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.