LEGEND VALENCIA
LEGEND PROPERTY · Bengaluru South
MAHAVEER TRIDENT
Timeline
Every flat the builder registered. Look yours up and check it is on the record.
Areas are not shown for this project. The sizes filed against these flats are not credible — units recorded as 2 and 3 BHK are filed at sizes no flat is, which usually means square feet were entered in a column the register labels square metres. Publishing those as the registered carpet area would be worse than publishing nothing. The flat numbers and types above are the register’s.
| Unit | Type | Unit | Type |
|---|---|---|---|
| G-01Ground Floor · BLOCK A | 3BHK-3T | G-02Ground Floor · BLOCK A | 3BHK-3T |
| G-03Ground Floor · BLOCK A | 2BHK-2T | G-04Ground Floor · BLOCK A | 2BHK-2T |
| G-05Ground Floor · BLOCK A | 3BHK-2T | G-06Ground Floor · BLOCK A | 3BHK-3T |
| G-07Ground Floor · BLOCK A | 3BHK-3T | G-08Ground Floor · BLOCK A | 2BHK-2T |
| G-09Ground Floor · BLOCK A | 2BHK-2T | 1011st Floor · BLOCK A | 3BHK-3T |
| 1021st Floor · BLOCK A | 3BHK-3T | 1031st Floor · BLOCK A | 2BHK-2T |
| 1041st Floor · BLOCK A | 2BHK-2T | 1051st Floor · BLOCK A | 3BHK-2T |
| 1061st Floor · BLOCK A | 3BHK-3T | 1071st Floor · BLOCK A | 3BHK-3T |
| 1081st Floor · BLOCK A | 2BHK-2T | 1091st Floor · BLOCK A | 2BHK-2T |
| 2012nd Floor · BLOCK A | 3BHK-3T | 2022nd Floor · BLOCK A | 3BHK-3T |
| 2032nd Floor · BLOCK A | 2BHK-2T | 2042nd Floor · BLOCK A | 2BHK-2T |
| 2052nd Floor · BLOCK A | 3BHK-2T | 2062nd Floor · BLOCK A | 3BHK-3T |
| 2072nd Floor · BLOCK A | 3BHK-3T | 2082nd Floor · BLOCK A | 2BHK-2T |
| 2092nd Floor · BLOCK A | 2BHK-2T | 3013rd Floor · BLOCK A | 3BHK-3T |
| 3023rd Floor · BLOCK A | 3BHK-3T | 3033rd Floor · BLOCK A | 2BHK-2T |
| 3043rd Floor · BLOCK A | 2BHK-2T | 3053rd Floor · BLOCK A | 3BHK-2T |
| 3063rd Floor · BLOCK A | 3BHK-3T | 3073rd Floor · BLOCK A | 3BHK-3T |
| 3083rd Floor · BLOCK A | 2BHK-2T | 3093rd Floor · BLOCK A | 2BHK-2T |
| G-10Ground Floor · BLOCK B | 2BHK-2T | G-11Ground Floor · BLOCK B | 3BHK-3T |
| G-12Ground Floor · BLOCK B | 3BHK-2T | G-13Ground Floor · BLOCK B | 3BHK-3T |
| G-14Ground Floor · BLOCK B | 3BHK-3T | G-15Ground Floor · BLOCK B | 3BHK-3T |
| G-16Ground Floor · BLOCK B | 3BHK-3T | 1101st Floor · BLOCK B | 2BHK-2T |
| 1111st Floor · BLOCK B | 3BHK-3T | 1121st Floor · BLOCK B | 3BHK-2T |
| 1131st Floor · BLOCK B | 3BHK-3T | 1141st Floor · BLOCK B | 3BHK-3T |
| 1151st Floor · BLOCK B | 3BHK-3T | 1161st Floor · BLOCK B | 3BHK-3T |
| 2102nd Floor · BLOCK B | 2BHK-2T | 2112nd Floor · BLOCK B | 3BHK-3T |
| 2122nd Floor · BLOCK B | 3BHK-2T | 2132nd Floor · BLOCK B | 3BHK-3T |
| 2142nd Floor · BLOCK B | 3BHK-3T | 2152nd Floor · BLOCK B | 3BHK-3T |
| 2162nd Floor · BLOCK B | 3BHK-3T | 3103rd Floor · BLOCK B | 2BHK-2T |
| 3113rd Floor · BLOCK B | 3BHK-3T | 3123rd Floor · BLOCK B | 3BHK-2T |
| 3133rd Floor · BLOCK B | 3BHK-3T | 3143rd Floor · BLOCK B | 3BHK-3T |
| 3153rd Floor · BLOCK B | 3BHK-3T | 3163rd Floor · BLOCK B | 3BHK-3T |
| G-17Ground Floor · BLOCK C | 3BHK-3T | G-18Ground Floor · BLOCK C | 2BHK-2T |
| G-19Ground Floor · BLOCK C | 3BHK-3T | G-20Ground Floor · BLOCK C | 2BHK-2T |
| G-21Ground Floor · BLOCK C | 2BHK-2T | G-22Ground Floor · BLOCK C | 2BHK-2T |
| G-23Ground Floor · BLOCK C | 2BHK-2T | G-24Ground Floor · BLOCK C | 2BHK-2T |
| G-25Ground Floor · BLOCK C | 3BHK-3T | G-26Ground Floor · BLOCK C | 2BHK-2T |
| G-27Ground Floor · BLOCK C | 2BHK-2T | G-28Ground Floor · BLOCK C | 2BHK-2T |
| G-29Ground Floor · BLOCK C | 2BHK-2T | G-30Ground Floor · BLOCK C | 2BHK-2T |
| 1171st Floor · BLOCK C | 3BHK-3T | 1181st Floor · BLOCK C | 2BHK-2T |
| 1191st Floor · BLOCK C | 3BHK-3T | 1201st Floor · BLOCK C | 2BHK-2T |
| 1211st Floor · BLOCK C | 2BHK-2T | 1221st Floor · BLOCK C | 2BHK-2T |
| 1231st Floor · BLOCK C | 2BHK-2T | 1241st Floor · BLOCK C | 2BHK-2T |
| 1251st Floor · BLOCK C | 3BHK-3T | 1261st Floor · BLOCK C | 2BHK-2T |
| 1271st Floor · BLOCK C | 2BHK-2T | 1281st Floor · BLOCK C | 2BHK-2T |
| 1291st Floor · BLOCK C | 2BHK-2T | 1301st Floor · BLOCK C | 2BHK-2T |
| 2172nd Floor · BLOCK C | 3BHK-3T | 2182nd Floor · BLOCK C | 2BHK-2T |
| 2192nd Floor · BLOCK C | 3BHK-3T | 2202nd Floor · BLOCK C | 2BHK-2T |
| 2212nd Floor · BLOCK C | 2BHK-2T | 2222nd Floor · BLOCK C | 2BHK-2T |
| 2232nd Floor · BLOCK C | 2BHK-2T | 2242nd Floor · BLOCK C | 2BHK-2T |
| 2252nd Floor · BLOCK C | 3BHK-3T | 2262nd Floor · BLOCK C | 2BHK-2T |
| 2272nd Floor · BLOCK C | 2BHK-2T | 2282nd Floor · BLOCK C | 2BHK-2T |
| 2292nd Floor · BLOCK C | 2BHK-2T | 2302nd Floor · BLOCK C | 2BHK-2T |
| 3173rd Floor · BLOCK C | 3BHK-3T | 3183rd Floor · BLOCK C | 2BHK-2T |
| 3193rd Floor · BLOCK C | 3BHK-3T | 3203rd Floor · BLOCK C | 2BHK-2T |
| 3213rd Floor · BLOCK C | 2BHK-2T | 3223rd Floor · BLOCK C | 2BHK-2T |
| 3233rd Floor · BLOCK C | 2BHK-2T | 3243rd Floor · BLOCK C | 2BHK-2T |
| 3253rd Floor · BLOCK C | 3BHK-3T | 3263rd Floor · BLOCK C | 2BHK-2T |
| 3273rd Floor · BLOCK C | 2BHK-2T | 3283rd Floor · BLOCK C | 2BHK-2T |
| 3293rd Floor · BLOCK C | 2BHK-2T | 3303rd Floor · BLOCK C | 2BHK-2T |
| G-31Ground Floor · BLOCK D | 2BHK-2T | G-32Ground Floor · BLOCK D | 2BHK-2T |
| G-33Ground Floor · BLOCK D | 2BHK-2T | G-34Ground Floor · BLOCK D | 2BHK-2T |
| G-35Ground Floor · BLOCK D | 2BHK-2T | 1311st Floor · BLOCK D | 2BHK-2T |
| 1321st Floor · BLOCK D | 2BHK-2T | 1331st Floor · BLOCK D | 2BHK-2T |
| 1341st Floor · BLOCK D | 2BHK-2T | 1351st Floor · BLOCK D | 2BHK-2T |
| 2312nd Floor · BLOCK D | 2BHK-2T | 2322nd Floor · BLOCK D | 2BHK-2T |
| 2332nd Floor · BLOCK D | 2BHK-2T | 2342nd Floor · BLOCK D | 2BHK-2T |
| 2352nd Floor · BLOCK D | 2BHK-2T | 3313rd Floor · BLOCK D | 2BHK-2T |
| 3323rd Floor · BLOCK D | 2BHK-2T | 3333rd Floor · BLOCK D | 2BHK-2T |
| 3343rd Floor · BLOCK D | 2BHK-2T | 3353rd Floor · BLOCK D | 2BHK-2T |
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from REDDY STRUCTURES PRIVATE LIMITED— the full portfolio →









₹44.71 Cr declared. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
A building already stood within ~56 m of the recorded location in 2016 (about 16 m), 17 m in 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~56 m of the filed location.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 2,111 RERA projects — about 1 in 4 in Karnataka, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Karnataka overall — 100% apartments here vs 62% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
14 complaints · 14 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to RERA Karnataka appear here at all.
| Number | Date | Status | |
|---|---|---|---|
| 00433/2024 | Interest on delay period | 13 May 2024 | Disposed — authority bench 4 |
| 01711/2023 | Delayed in Site handover and no proper communication | 16 Nov 2023 | Disposed — authority bench 4 |
| 01298/2023 | Possession date was violated | 30 Aug 2023 | Disposed — authority bench 4 |
| 00803/2023 | Delay in hanover/Possession | 22 May 2023 | Disposed — authority bench 4 |
| 00681/2023 | Delay in handover/Possession | 5 May 2023 | Disposed — authority bench 5 |
| Number | Date | Status | |
|---|---|---|---|
| 00509/2023 | Delay In Handover Of The Project | 18 Apr 2023 | Disposed — authority bench 5 |
| 00297/2023 | Delay in Handover?posession | 6 Mar 2023 | Disposed — authority bench 5 |
| 00278/2023 | Posession/handover is delayed | 2 Mar 2023 | Disposed — authority bench 5 |
| 00269/2023 | Delay in Handover/Possession | 28 Feb 2023 | Disposed — authority bench 5 |
| 00270/2023 | Delay in Handover/ Possession | 28 Feb 2023 | Disposed — authority bench 5 |
| 00254/2023 | Delay in Hand Over | 27 Feb 2023 | Disposed — authority bench 5 |
| 00257/2023 | Project delayed and no comensation offered | 27 Feb 2023 | Disposed — authority bench 5 |
| 00009/2023 | Delay in Handover/Possession | 4 Jan 2023 | Disposed — authority bench 4 |
| CMP/221208/0010438 | Project Delayed with breach of agreement terms | 8 Dec 2022 | Disposed — authority bench 4 |
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
919 residential projects still under way within 25 km. Step out ring by ring:
Of the 471 projects the radar draws within 6 km — every kind, every stage — 133 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
LEGEND PROPERTY · Bengaluru South
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mahaveer-trident-bengaluru-south-9cw1pwli.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.