HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Almeida Avana

P51800030236 · MahaRERA · https://gethorizon.in/projects/almeida-avana-andheri-xhj7h04f

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
31 units
Floors
11
Buildings
2
Parking
13 spaces
Land area
443 sq m
Sanctioned built-up
623 sq m

Timeline

RERA registeredAug 2021
Proposed completionDec 2023
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

D' Almeida Developers

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2021–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 318 new projects last year
  • 2,916 nearby projects
1 km radius · coordinates as filed · 19.0778, 72.8655 · © OpenStreetMap contributors
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400029
Survey no.
6389 6390 6391
North boundary
CTS No 6393
East boundary
CTS No 6387
South boundary
DP Road
West boundary
CTS No 6393 6395
What’s nearby
SchoolsNearest school 1.1km away
HealthcareHospital 257m away · 3 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · 6 restaurants and cafes within 1km
ShoppingSupermarket 1.1km away
Getting around
Expressway 574 m · FlyoverPrimary road 710 m · BKC - SCLR ConnectorRailway line 2.0 kmMetro station 1.9km away (Bandra Colony)Bus stop within 500m
Water & environment
River 716 m · Mithi River
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 (about 8 m), 16 m in 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 6389 6390 6391

The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

4,013 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,916 projects the radar draws within 6 km — every kind, every stage — 975 are residential projects still under way. This list keeps only those, and looks further out.

22 projects within 1 km — showing the nearest 6.

200 m awayResidential / Group Housing

Titan Maverick CHS (NSLD)

Titan Maverick Lifespaces · Greater Mumbai · Mumbai

Jul 2026registered
Jun 2030target completion
Scale114 flatsAuthorityMahaRERA
270 m awayOthers

SUN SUMIT NAOMI ARK

Sun Sumit Venture · Kolekalyan · Andheri

Jun 2025registered
Oct 2027target completion
Government Guidance Rate₹1,51,933/sq ydScale20 flatsAuthorityMahaRERA
450 m awayOthers

GOLDEN VISTA

BLUE DIAMOND SPACES PRIVATE LIMITED · Kolekalyan · Andheri

Jan 2025registered
Dec 2029target completion
Government Guidance Rate₹1,51,933/sq ydScale172 flatsAuthorityMahaRERA
450 m awayResidential / Group Housing

Crescent Nexus- (Ascent)

ASCENT INFRASPACE PRIVATE LIMITED · Andheri

Jul 2021registered
Dec 2026target completion
1 open complaintScale100 flatsAuthorityMahaRERA
450 m awayOthers

CRESCENT NEXUS- ASCENT C WING

ASCENT INFRASPACE PRIVATE LIMITED · Andheri

May 2024registered
Dec 2026target completion
Scale24 flatsAuthorityMahaRERA
520 m awayMixed

CENTRAL PARK

JAAVI INFRA PVT. LTD. · Kolekalyan · Andheri

May 2026registered
Dec 2032target completion
Scale26 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/almeida-avana-andheri-xhj7h04f.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.