The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400029
Survey no.
6034 TO 6039
North boundary
MUNICIPAL ROAD
East boundary
WELL CARE HOSPITAL LTD
South boundary
SUTHITRA APARTMENT
West boundary
GANGA GOVIND CHS LTD
What’s nearby
SchoolsNearest school 1.1km away
HealthcareHospital 255m away · 3 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · 7 restaurants and cafes within 1km
ShoppingSupermarket 1.0km away · Bank 918m away
Getting around
Expressway 440 m · Santa Cruz – Chembur Link RoadPrimary road 736 m · BKC - SCLR ConnectorRailway line 1.9 kmMetro station 1.7km away (Bandra Colony)5 bus stops within 500m
Water & environment
River 790 m · Mithi River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Brhihan Mumbai Municipal Corporation
Municipal Corporation
Building Permit
Survey no. 6034 TO 6039
The promised possession date (31 May 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,978 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,912 projects the radar draws within 6 km — every kind, every stage — 985 are residential projects still under way. This list keeps only those, and looks further out.