HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Kalpataru Bliss Apartments

P51800020262 · MahaRERA · https://gethorizon.in/projects/kalpataru-bliss-apartments-andheri-yetz6a8m

01

Complete project overview

MahaRERA · Registration filing
Floors
19
Buildings
2
Parking
101 spaces
Land area
1,947 sq m
Sanctioned built-up
6,715 sq m
Recreational open space
486 sq m

Timeline

RERA registeredMar 2019
Proposed completionSep 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Klassik Vinyl Products LLP

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2019–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 318 new projects last year
  • 2,929 nearby projects
1 km radius · coordinates as filed · 19.0719, 72.8625 · © OpenStreetMap contributors
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400098
Survey no.
CTS No 4958D pt, 4958D-52Pt, 53Pt, 54Pt, 55 to 71, 75 pt, 76 to 124 of Village Kolekalyan
North boundary
CTS 4953D Part
East boundary
13 Mt wide Road
South boundary
CTS No 4956 and 4950A
West boundary
Partly by CTS No 4958D-125 Partly CTS No 4961
What’s nearby
Schools1 school within 1km
HealthcareHospital 469m away · 3 clinics within 1km · Pharmacy within 500m
LifestylePark 714m away · Gym or sports centre 1.7km away · 17+ restaurants and cafes within 1km
ShoppingSupermarket 1.1km away · Bank 707m away
Getting around
Expressway 74 m · Santa Cruz – Chembur Link RoadPrimary road 622 m · Bandra Kurla Complex RoadRailway line 1.7 km · Central LineMetro station 1.4km away (Bandra Colony)5 bus stops within 500m
Water & environment
Canal 1.1 km
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~25 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~25 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~25 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Maharashtra Housing and Area Development Authority (MHADA)

Housing Authority
Building Permit
Survey no. CTS No 4958D pt, 4958D-52Pt, 53Pt, 54Pt, 55 to 71, 75 pt, 76 to 124 of Village Kolekalyan

The promised possession date (30 Sep 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Maharashtra Housing and Area Development Authority (MHADA)

Planning authority

Has approved 438 RERA projects2.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

3,935 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,929 projects the radar draws within 6 km — every kind, every stage — 989 are residential projects still under way. This list keeps only those, and looks further out.

24 projects within 1 km — showing the nearest 6.

70 m awayResidential / Group Housing

Sanghvi Infenia

Sanghvi Spaces LLP · Andheri

Mar 2022registered
Dec 2026target completion
2 open complaintsAuthorityMahaRERA
80 m awayMixed

ONE ALAG

ALAG INFRAESTATE LLP · Chembur · Kurla

Apr 2026registered
Dec 2028target completion
Government Guidance Rate₹1,37,627/sq ydScale6 flatsAuthorityMahaRERA
100 m awayResidential / Group Housing

TRIGUN

National Properties · Chembur · Kurla

Jan 2025registered
Nov 2027target completion
Scale34 flatsAuthorityMahaRERA
100 m awayResidential / Group Housing

Vighnaharta Enclave

Vighnaharta Heights Private Limited · Chembur · Kurla

Mar 2025registered
Dec 2028target completion
Government Guidance Rate₹1,70,328/sq ydScale158 flatsAuthorityMahaRERA
100 m awayResidential / Group Housing

ANUPAMA

SHREE KRISHNA MAJESTIC LLP · Others · CTSO Chembur

Nov 2025registered
Mar 2028target completion
Scale2 flatsAuthorityMahaRERA
100 m awayResidential / Group Housing

SB ONE

S B SHELTERS LLP · Chembur · Kurla

Jun 2026registered
Jun 2030target completion
Government Guidance Rate₹1,83,614/sq ydScale6 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • Complaints before MahaRERA.
    • Appeals to the Appellate Tribunal: MahaRERA's own register.
    • Orders said not to be complied with: MahaRERA's own register.
    • Court cases, as declared by the builder, in its MahaRERA filing.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kalpataru-bliss-apartments-andheri-yetz6a8m.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.