HORIZONMarkets
Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
37 units
Mix
18 × 3 BHK · 11 × 2.5 BHK · 3 × 4 BHK · 3 × 2 BHK · 1 × 1 RK · 1 × Shop
Carpet area
21–125 sq mper-unit range, as filed
Floors
16
Parking
18 spaces
Land area
978 sq m
Sanctioned built-up
979 sq m

Timeline

RERA registeredAug 2017
Proposed completionJun 2019
TodayJul 2026

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

37 units across 12 batches
TypeArea sq mCount
3 BHK1061
1 RK211
3 BHK1051
3 BHK751
4 BHK1061
4 BHK1252
3 BHK937
3 BHK868
2 BHK731
2 BHK562
2.5 BHK7611
Shop501

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Promoter registration

Rajpurohit Builders LLP

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2017–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400098
Survey no.
5019/A
North boundary
CTS No 4761
East boundary
By the Rajhans CHS
South boundary
CTS No 5025A
West boundary
By the main CST Road
What’s nearby
SchoolsNearest school 1.1km away
HealthcareHospital 461m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 789m away · Gym or sports centre 1.6km away · 15+ restaurants and cafes within 1km
ShoppingSupermarket 1.1km away · Bank 756m away
Getting around
Expressway 21 mPrimary road 650 m · Bandra Kurla Complex RoadRailway line 1.8 km · Central LineMetro station 1.3km away (Bandra Colony)5 bus stops within 500m
Water & environment
Canal 969 m
distances only — not a flood assessment
04

Planning authority

MahaRERA · Approved building plan

Shri Shivanand S Mendigeri Asst Eng (B P ) H Ward Assistant Engineer

Building Permit
Survey no. 5019/A

The promised possession date (30 Jun 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that sanctioned this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

Legal & regulatory record
LitigationNone declared to MahaRERA
Appeals1 appeal before the tribunal
From MahaRERA's record — the litigation flag is the promoter's declaration; complaints, appeals and non-compliance notices are the authority's own filings. A flagged line is worth checking with the authority; none of it is a verdict on the project.
Complaints register

1 complaint on MahaRERA’s register for this project 1 disposed.

A count from the authority’s public register — not a judgement. A disposed complaint may have been resolved for or against the builder, and only disputes escalated this far appear at all.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.