67 of 114 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
4,087 sq m
Floor area
16,008 sq m
Description
Capkon Zion
Timeline
RERA registeredNov 2024
Project startedJan 2025
Proposed completionNov 2029
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
47 of 114 available
TypeArea sq mAvailable
2BHK662 of 13
2BHK645 of 12
2BHK668 of 26
2BHK544 of 12
2BHK677 of 12
3BHK909 of 13
2BHK613 of 13
3BHK879 of 13
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
CAPKON DEVELOPERS PRIVATE LIMITED
CompanyPromoter type
Kozhikode, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Kozhikode Municipal CorporationMunicipal Corporation2 of 6 projects
Kannur Municipal CorporationMunicipal Corporation1 of 6 projects
Municipal Corporation KozhikodeLocal body (LSGI)1 of 6 projects
OlavannaLocal body (LSGI)this project1 of 6 projects
Olavanna Grama PanchayatGrama Panchayat1 of 6 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools2 schools within 1km · College or university 1.8km away
HealthcareHospital 1.8km away · 1 clinic within 1km
LifestyleNo parks within 2km · Swimming pool within 2km
ShoppingSupermarket 1.6km away · Mall 1.9km away
Getting around
Expressway 849 m · Kannur-Calicut-Valanchery HighwayPrimary road 4.7 km · Old NH17 RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 256 m · Manakkadavu ParakkulamRiver 1.3 km · Chaliyar River
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹883per sq yd
₹1,056per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Pantheerankavu”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan SC4-BA(360513)/2024 on the approving authority’s portal to confirm the approval.
The approving body, at scale
The local self-government (LSGI)
The local body that approved this project. It has approved 404 RERA projects across 14 districts — about 1 in 4 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to K-RERA
Litigation
None declared in this filing
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
62 residential projects still under way within 25 km. Step out ring by ring:
Of the 34 projects the radar draws within 6 km — every kind, every stage — 14 are residential projects still under way. This list keeps only those, and looks further out.
3 projects between 1 and 3 km — showing the nearest 3.
PANTHEERANKAVUResidential (Apartment)
LANDMARK MAGNUM CENTRE
CALICUT LANDMARK BUILDERS AND DEVELOPERS INDIA PRIVATE LIMITED
4 yr 10 mo
Aug 2022registered
Jun 2027target completion
Government Guidance Rate₹1,656/sq ydScale156 flatsAuthorityK-RERA