Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
16 units across 5 batches
TypeArea sq mCount
2 BHK515
1 BHK404
2 BHK544
Shop191
Shop172
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Thane (M Corp.)
Taluka
Thane
District
Thane
Pincode
401604
Survey no.
66/1
North boundary
CHAWL
East boundary
OPEN TO ROAD
South boundary
BUILDING
West boundary
OPEN
What’s nearby
SchoolsNearest school 1.2km away
HealthcareHospital 464m away
LifestyleNo parks within 2km · Gym or sports centre 247m away
ShoppingSupermarket 1.9km away · Bank 250m away · ATM within 500m
Getting around
Expressway 411 m · Eastern Express HighwayPrimary road 1.4 km · Saket FlyoverRailway line 571 mRailway station 1.1km away (Kalva)6 bus stops within 500m
Water & environment
Water body 472 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12400722
10 Nov 2024
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,812 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,479 projects the radar draws within 6 km — every kind, every stage — 489 are residential projects still under way. This list keeps only those, and looks further out.
9 projects within 1 km — showing the nearest 6.
ThaneMixed
SHREE SADGURU SHARANAM
BHAVIKA CONSTRUCTION
3 yr 1 mo
Feb 2026registered
Mar 2029target completion
Government Guidance Rate₹60,034/sq ydScale38 flatsAuthorityMahaRERA