HORIZON
Share

AMOL SAUBHAGYA

PR1330002503048 · MahaRERA · https://gethorizon.in/projects/amol-saubhagya-kalwa-thane-q6za7h7l

01

Complete project overview

MahaRERA · Registration filing
Units
54 units
Floors
9
Buildings
2
Parking
46 spaces
Land area
1,029 sq m
Sanctioned built-up
2,892 sq m

Timeline

RERA registeredMar 2026
Proposed completionMar 2028
TodaySep 2026
Construction progress
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Superstructure5%
Stilt floor60%
Excavation100%
Plinth100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

SUMAN REALTIES

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kalwa
Taluka
Thane
District
Thane
Pincode
400605
Survey no.
C.T.S. No. 654, Sector No. 8, Kalwa, Thane
North boundary
CTS 655, 656, 650
East boundary
CTS NO 652
South boundary
9 METER WIDE DP ROAD
West boundary
9 METER WIDE DP ROAD
What’s nearby
Schools2 schools within 1km · College or university 1.2km away · Library 1.5km away
HealthcareHospital 109m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 1.8km away · Gym or sports centre 1.5km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.7 km · Eastern Express HighwayPrimary road 389 m · Saket FlyoverRailway line 257 mRailway station 561m away (Kalva)9 bus stops within 500m
Water & environment
Water body 422 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹72,743per sq yd
₹87,000per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Kalwa”.
In force
2026-2027 schedule
Spread
₹40,970₹77,091 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Thane Municipal Corporation

Municipal Corporation
Building Permit
Survey no. C.T.S. No. 654, Sector No. 8, Kalwa, Thane
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Thane Municipal Corporation

Municipal corporation

Has approved 489 RERA projects2.4% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
318
On record
7,890 flats · 0 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,880 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,595 projects the radar draws within 6 km — every kind, every stage — 547 are residential projects still under way. This list keeps only those, and looks further out.

8 projects within 1 km — showing the nearest 6.

170 m awayResidential / Group Housing

SUNSHINE

M/S SIDDHIVINAYAK DEVELOPERS · Thane

May 2024registered
Dec 2028target completion
Government Guidance Rate₹60,034/sq ydScale24 flatsAuthorityMahaRERA
260 m awayMixed

SAI PALACE

SAI ENTERPRISES · Thane

Apr 2026registered
Aug 2029target completion
Government Guidance Rate₹60,034/sq ydScale50 flatsAuthorityMahaRERA
310 m awayResidential / Group Housing

SHREE SAI CHARAN CHSL

MANDAR CONSTRUCTIONS AND DEVELOPERS LLP · Thane

Nov 2025registered
May 2029target completion
Government Guidance Rate₹60,034/sq ydScale114 flatsAuthorityMahaRERA
320 m awayOthers

ASHAR ARIZE N.M.M. SOCIETY TOWER A

Ms ASHAR VENTURES · Thane

Apr 2022registered
Jan 2027target completion
Government Guidance Rate₹60,034/sq ydScale396 flatsAuthorityMahaRERA
400 m awayResidential / Group Housing

GAONDEVI ARCADE

TABISH ZAID CHEULKAR · Thane

Feb 2025registered
Jul 2027target completion
Government Guidance Rate₹60,034/sq ydScale39 flatsAuthorityMahaRERA
510 m awayResidential / Group Housing

Birla Taranya - Phase 1

Ekamaya Properties Private Limited · Kalwa · Thane

Feb 2026registered
Mar 2032target completion
Government Guidance Rate₹72,743/sq ydScale1,339 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.