HORIZON
Share

Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd.

P51800055918 · MahaRERA · https://gethorizon.in/projects/kurla-vijay-rahivashi-sangh-co-op-hsg-chembur-kurla-sov2qy6e

01

Complete project overview

MahaRERA · Registration filing
Floors
19
Buildings
2
Parking
79 spaces
Land area
2,997 sq m
Sanctioned built-up
7,286 sq m
Recreational open space
214 sq m

Timeline

RERA registeredApr 2024
Proposed completionDec 2029
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
External finishes25%
Internal finishes50%
Stairs & lifts60%
Superstructure80%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

VIKAS NARAYAN RAIKAR

IndividualPromoter type
Mumbai Suburban, MAHARASHTRABased in
3Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
33 homeson the public record across 3 projects
12,339 sq mbuilt-up filed
8,693 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from VIKAS NARAYAN RAIKAR— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Chembur
Taluka
Kurla
District
Mumbai Suburban
Pincode
400024
Survey no.
111 A (pt), 111/47 to 52, 54 to 65 & 114/23 (pt)
North boundary
45 mtr wide S G Barve Marg
East boundary
Compound wall of S T Depot
South boundary
Compound wall of S T Bus Depot
West boundary
Compound wall of Vimochit CHSL
What’s nearby
Schools1 school within 500m
HealthcareHospital 330m away · 2 clinics within 1km · Doctor's clinic within 1km
LifestylePark 818m away · 11+ restaurants and cafes within 1km
ShoppingSupermarket 408m away · Bank 267m away
Getting around
Expressway 893 m · Santa Cruz – Chembur Link RoadPrimary road 109 m · Lal Bahadur Shastri MargRailway line 376 mRailway station 417m away (Kurla)Bus stop within 1km
Water & environment
River 343 m · Mithi River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 111 A (pt), 111/47 to 52, 54 to 65 & 114/23 (pt)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,382 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 2,767 projects the radar draws within 6 km — every kind, every stage — 956 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

57 projects within 1 km — showing the nearest 6.

60 m awayMixed

Akhand Phase 3

TECHTON LIFESPACES LLP · Gokhiware · Vasai

Jul 2026registered
Dec 2030target completion
Government Guidance Rate₹55,770/sq ydScale546 flatsAuthorityMahaRERA
80 m awayResidential / Group Housing

MAJESTIC VISTA

MAJESTIC ROYALE VISMIT INFRAVENTURES LLP · Kurla

Mar 2025registered
Jun 2028target completion
Scale44 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

Yojan One

MERU REALTY LLP · Kurla

Apr 2021registered
Sep 2026target completion
Scale327 flatsAuthorityMahaRERA
220 m awayMixed

ELEVATE 9

MERU REALTY LLP · Kurla

Jun 2026registered
Mar 2031target completion
Scale70 flatsAuthorityMahaRERA
230 m awayMixed

Malad Vrindavan CHSL

Omnetra DB Infra LLP · Malad · Borivali

Aug 2025registered
Dec 2028target completion
Scale58 flatsAuthorityMahaRERA
250 m awayMixed

FIRDAUS APARTMENTS

MAK CORPORATION · Kurla

Jun 2026registered
Mar 2029target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.