M R INFRASTRUCTURE AND DEVELOPERS

P51800024803 · MahaRERA · https://gethorizon.in/projects/m-r-infrastructure-and-developers-andheri-7nkvuc0o

01

Complete project overview

MahaRERA · Registration filing
Project name
M R INFRASTRUCTURE AND DEVELOPERS
Units
18 units
Mix
18 × 2 BHK
Carpet area
67 sq mper-unit range, as filed
Floors
16
Buildings
2
Land area
827 sq m
Sanctioned built-up
1,450 sq m

Timeline

RERA registeredMar 2020
Proposed completionMar 2023
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Treatment And Disp…0%
Fire protection an…0%
Electrical meter r…0%
Internal finishes20%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

18 units across 1 batch
TypeArea sq mCount
2 BHK6718

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M. R. INFRASTRUCTURE & DEVELOPERS

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2020–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400052
Survey no.
E86-16
North boundary
D P ROAD
East boundary
D P ROAD
South boundary
KHAR SAMATA CHS
West boundary
KHAR SHALIMAR CHS
What’s nearby
SchoolsNearest school 1.1km away · College or university 663m away
HealthcareHospital 530m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 1.6km away · Gym or sports centre 472m away · 45+ restaurants and cafes within 1km
ShoppingSupermarket 769m away · Convenience store within 500m · Bank 239m away
Getting around
Expressway 1.9 kmPrimary road 1.0 km · Swami Vivekanand RoadRailway line 1.3 km · Central Railway (Harbour Line)Railway station 1.4km away (Khar Road)3 bus stops within 500m
Water & environment
Water body 420 m · Danda Creek
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,522 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,842 projects the radar draws within 6 km — every kind, every stage — 700 are residential projects still under way. This list keeps only those, and looks further out.

58 projects within 1 km — showing the nearest 6.

Greater MumbaiResidential / Group Housing

Fortune Mastan

Nina Farms Private Limited

Dec 2024registered
Dec 2030target completion
AuthorityMahaRERA
BandraMixed

Crest Uno

CREST VENTURES LIMITED

Jun 2026registered
Dec 2029target completion
Government Guidance Rate₹3,51,834/sq ydScale43 flatsAuthorityMahaRERA
BandraResidential / Group Housing

ARTHA

AUM LIFESPACES

May 2024registered
Dec 2027target completion
Scale50 flatsAuthorityMahaRERA
BandraResidential / Group Housing

SNOW WHITE A BUILDING CHS LTD

SHREE RIDDHI SIDDHI REAL VENTURES LLP

Jun 2025registered
Apr 2028target completion
Scale21 flatsAuthorityMahaRERA
BandraResidential / Group Housing

17 West

Strive Realty LLP

Aug 2025registered
Dec 2027target completion
Scale16 flatsAuthorityMahaRERA
BandraResidential / Group Housing

EVAANA

EKTA NAGPAL VENTURES LLP

Oct 2023registered
Apr 2027target completion
Scale36 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.