Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · College or university 1.2km away
HealthcareHospital 1.3km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 kmPrimary road 1.3 km · B2 BypassRailway line 2.8 km · Jaipur to Sawai Madhopur LineRailway station 3.4km awayLimited bus connectivity nearby
Water & environment
Water body 2.8 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹6.20 Cr declared to build 12 flats. What that works out to:
₹51.64 Lakhdeclared cost per flatall-in — land + construction
₹1,836/sq ftof built-up area₹19,761/sq m
11%of the cost is land₹1,169/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹585per sq yd
₹700per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Balrampura”.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 15 Oct 2022 · 3 yrs ago
The promised possession date (31 Aug 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
421 residential projects still under way within 25 km. Step out ring by ring:
Of the 530 projects the radar draws within 6 km — every kind, every stage — 130 are residential projects still under way. This list keeps only those, and looks further out.