6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 101 to 601 :All 3BHK · 6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 102 to 602 :All 3BHK · 6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 103 to 603 :All 3BHK · 6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 105 to 605 :All 3BHK · 6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 106 to 606 :All 3BHK · 6 × Floor-FlatNo.: Ground to Fifth Floor - Flat 104 to 604 :All 3BHK
Carpet area
66–75 sq mper-type range, as filed
Land area
836 sq m
Description
Note 1) Under Common Details tab, parking is marked as per the approved drawing and calculation table and a stated logic that, all the vehicles that are fully covered (including handicap parking and within outer most projection line on both sides) are marked as parked on stilt floor and any uncovered or semi-covered vehicle is marked as parked in open area. The visitors parking is provided over and above the parking provided and hence marked under open area. 2) The open area is mentioned as per the certificate issued by the architect which is attached under Documents Tab. 3) The promoter has provisioned the club house at the stilt floor of the building and common terrace at the terrace floor
of the building, which being a facility is for the use of the residents of the building and not for sale. Kindly take a note.
Timeline
Construction startDec 2022
RERA registeredOct 2023
Proposed completionDec 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
36 units across 6 batches
BuildingTypeArea sq mCount
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 101 to 601 :All 3BHK756
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 102 to 602 :All 3BHK696
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 103 to 603 :All 3BHK726
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 105 to 605 :All 3BHK736
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 106 to 606 :All 3BHK666
R R HEIGHTSFloor-FlatNo.: Ground to Fifth Floor - Flat 104 to 604 :All 3BHK676
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · College or university 1.3km away
HealthcareHospital 1.4km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 kmPrimary road 1.3 km · B2 BypassRailway line 2.8 kmRailway station 3.4km awayLimited bus connectivity nearby
Water & environment
Water body 2.8 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹8.40 Cr declared to build 36 flats. What that works out to:
₹23.35 Lakhdeclared cost per flatall-in — land + construction
₹2,150/sq ftof built-up area₹23,137/sq m
29%of the cost is land₹2,674/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹12,375per sq yd
₹14,800per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “KHEJADON KA BAS”.
Highest rate
₹30,937 per sq yd — the top road-facing rate among the 6 residential rates published for this village
By the road it faces
interior plot
₹14,800 / sq m
₹12,375 / sq yd
road-facing
₹27,500 / sq m
₹22,994 / sq yd
41–60 ft road
₹28,710 / sq m
₹24,005 / sq yd
61–99 ft road
₹30,020 / sq m
₹25,101 / sq yd
100 ft+ road
₹31,320 / sq m
₹26,188 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 16 Oct 2023 · 2 yrs ago
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
421 residential projects still under way within 25 km. Step out ring by ring:
Of the 530 projects the radar draws within 6 km — every kind, every stage — 130 are residential projects still under way. This list keeps only those, and looks further out.