10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 103 to 1003 : All 4BHK · 10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 108 to 1008-: All 4BHK · 10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 102 to 1002 :All 4BHK · 10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 101 to 1001 : All 4BHK · 10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 105 to 1005-: All 4BHK · 10 × Floor-FlatNo.:First Floor - 10th Floor : Flat 107 to 1007-: All 4BHK
Carpet area
100–111 sq mper-type range, as filed
Land area
2,400 sq m
Description
Note 1) Under Common Details tab, parking is marked as per the approved drawing and calculation table and a stated logic that, all the vehicles that are fully covered (within outer most projection line on both sides) are marked as parked on stilt floor and any uncovered or semi-covered vehicle is marked as parked in open area. The Basement parking is completely covered. The visitors parking is provided over and above the parking provided and hence marked under open area. 2) The open area is mentioned as per the certificate issued by the architect which is attached under Documents Tab. 3) The promoter has provisioned the club house, entertainment lobby and gym at the stilt floor of the building and common terrace and swimming pool at the terrace floor of the building, which being a facility is for the use of the residents of the building and not for sale. Kindly take a note.
Timeline
Construction startJul 2023
RERA registeredSep 2023
Proposed completionSep 2026
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
80 units across 8 batches
BuildingTypeArea sq mCount
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 103 to 1003 : All 4BHK11010
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 108 to 1008-: All 4BHK11110
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 102 to 1002 :All 4BHK10110
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 101 to 1001 : All 4BHK10410
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 105 to 1005-: All 4BHK10610
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 107 to 1007-: All 4BHK11010
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 106 to 1006-: All 4BHK10010
ROYAL CRYSTAFloor-FlatNo.:First Floor - 10th Floor : Flat 104 to 1004-: All 4BHK11110
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Khasra No. 110/1, 111/1, 111/2, 530/111 (North Part), In Scheme Ekal Patta, Ganpatpura, Sanganer, Jaipur, 302020
Village
Ganpatpura
Taluka
Sanganer
District
Jaipur
Pincode
302020
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.6km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 2.1 kmPrimary road 3.0 kmMetro station 3.1km away (Manasarovar)Limited bus connectivity nearby
Water & environment
Water body 3.6 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹32.11 Cr declared to build 80 flats. What that works out to:
₹40.14 Lakhdeclared cost per flatall-in — land + construction
₹2,027/sq ftof built-up area₹21,819/sq m
14%of the cost is land₹1,680/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 22 Sep 2023 · 3 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
420 residential projects still under way within 25 km. Step out ring by ring:
Of the 571 projects the radar draws within 6 km — every kind, every stage — 149 are residential projects still under way. This list keeps only those, and looks further out.