HORIZON
Share

PLATINUM TOWER-4

P51800000494 · MahaRERA · https://gethorizon.in/projects/platinum-tower-4-andheri-p1sonzkh

01

Complete project overview

MahaRERA · Registration filing
Project name
PLATINUM TOWER-4
Units
83 units
Mix
83 × Residential
Carpet area
28–54 sq mper-unit range, as filed
Floors
20
Parking
66 spaces
Land area
877 sq m
Sanctioned built-up
6,151 sq m

Timeline

RERA registeredJul 2017
Proposed completionSep 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

83 units across 4 batches
TypeArea sq mCount
Residential2814
Residential4014
Residential5423
Residential3032

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SHIVKRUPA GRUHPRAVESH LLP

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2017–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400058
Survey no.
195 PT, SURVEY NO 106/1A,1/6A
North boundary
40 FEET WIDE ROAD
East boundary
BUILDING NO 3
South boundary
MHADA BOUNDARY
West boundary
BUILDING NO 5
What’s nearby
SchoolsNearest school 1.3km away · College or university 791m away
HealthcareHospital 153m away · 10 clinics within 1km
Lifestyle2 parks within 500m · Gym or sports centre 713m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 396m away · Convenience store within 1km · Bank 504m away
Getting around
Expressway 299 m · Western Express HighwayPrimary road 388 m · Sant Gadge Maharaj MargRailway line 906 mMetro station 742m away (Jogeshwari (East))2 bus stops within 500m
Water & environment
Water body 573 m · Lokmanya Tilak Ganesh Visarjan Talao
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,849 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,200 projects the radar draws within 6 km — every kind, every stage — 739 are residential projects still under way. This list keeps only those, and looks further out.

28 projects within 1 km — showing the nearest 6.

10 m awayOthers

SAMARPAN

L K INFRACON LLP · Andheri

Feb 2021registered
Sep 2026target completion
Scale66 flatsAuthorityMahaRERA
150 m awayResidential / Group Housing

STANS ARIZE

STANS BUILDTECH HOUSING · Majas · Andheri

Apr 2026registered
Dec 2029target completion
Scale276 flatsAuthorityMahaRERA
290 m awayResidential / Group Housing

Kalpataru Vivant - South Wing B

Alder Residency Private Limited · Andheri

Apr 2022registered
Mar 2028target completion
1 open complaintScale86 flatsAuthorityMahaRERA
300 m awayOthers

AIM Garden

AIM Developers · Andheri

Dec 2022registered
Jul 2029target completion
Scale291 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Kalpataru Vivant - North Wing B

Alder Residency Private Limited · Andheri

May 2022registered
Mar 2028target completion
Scale102 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Kalpataru Vivant - South Wing A

Alder Residency Private Limited · Andheri

May 2022registered
Mar 2028target completion
Scale86 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.