Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Majas
Taluka
Andheri
District
Mumbai Suburban
Pincode
400060
Survey no.
139(pt), 139/404 to 139/501
North boundary
Slum Sahyog CHS
East boundary
Slum Shivdarshan CHS
South boundary
Jogeshwari Gufa BMC School
West boundary
Nala
What’s nearby
SchoolsNearest school 1.2km away · College or university 932m away
HealthcareHospital 98m away · 8 clinics within 1km
Lifestyle2 parks within 500m · Gym or sports centre 777m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 294m away · Convenience store within 1km · Bank 380m away
Getting around
Expressway 198 m · Western Express HighwayPrimary road 525 m · Sant Gadge Maharaj MargRailway line 821 mMetro station 781m away (Jogeshwari (East))Bus stop within 1km
Water & environment
Water body 714 m · Lokmanya Tilak Ganesh Visarjan Talao
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. 139(pt), 139/404 to 139/501
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,821 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,208 projects the radar draws within 6 km — every kind, every stage — 742 are residential projects still under way. This list keeps only those, and looks further out.