Timeline
Building permit grantedMay 2020
Proposed completionMay 2023
TodaySep 2026
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitCarpet sq m
G101GROUND555.75
101FIRST FLOOR951.97
102FIRST FLOOR955.50
103FIRST FLOOR529.89
105FIRST FLOOR1055.76
201SECOND FLOOR951.97
202SECOND FLOOR955.50
203SECOND FLOOR529.89
204SECOND FLOOR891.62
301THIRD FLOOR951.97
302THIRD FLOOR955.50
304THIRD FLOOR891.62
305THIRD FLOOR1055.76
401FORTH FLOOR951.97
402FORTH FLOOR955.50
403FORTH FLOOR529.89
404FORTH FLOOR891.62
405FORTH FLOOR1055.76
501FIFTH FLOOR951.97
502FIFTH FLOOR955.50
503FIFTH FLOOR529.89
505FIFTH FLOOR1055.76
601SIXTH FLOOR951.97
104FIRST FLOOR891.62
602SIXTH FLOOR955.50
603SIXTH FLOOR529.89
604SIXTH FLOOR891.62
605SIXTH FLOOR1055.76
205Second Floor1055.76
504Fifth Floor891.62
303Third Floor529.89
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
All 31 units as filed, two to a row · areas in sq m
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 364m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 102m away · ATM within 500m
Getting around
Primary road 2.7 kmRailway line 3.5 kmRailway station 3.6km away (Namkom Railway Station)Limited bus connectivity nearby
Water & environment
Water body 937 m
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~40 m of the recorded location until 2021; a building is first visible in 2022 and is about 21 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2022.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate could not be cross-checked against nearby filings.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Jharkhand registration department
In Jharkhand it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Jharkhand's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
JHARERA · Approved building plan
Building Permitapproved 17 May 2020 · 6 yrs ago
The promised possession date (17 May 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
JHARERA · public record
Complaints register
Not published. JHARERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to JHARERA
Litigation
None declared in this filing
Only what the builder declared, or what JHARERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with JHARERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
282 residential projects still under way within 25 km. Step out ring by ring:
Of the 240 projects the radar draws within 6 km — every kind, every stage — 118 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Jharkhand's published schedules.
06Planning authority
JHARERA: the approved building plan, as filed.
07Complaints & litigation
JHARERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/r-l-tower-euyabfug.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.