HORIZON
Share

SANGAM ENCLAVE

BRERAP00204-4/129/R-1278/2022 · RERA Bihar · https://gethorizon.in/projects/sangam-enclave-danapur-patna-ts9kmnjc

01

Complete project overview

RERA Bihar · Registration filing
Project name
SANGAM ENCLAVE
Units
24 units
Unit mix
24 × 3 BHK
Parking
26 spaces
Land area
1,095 sq m
Built-up area
2,610 sq m

Timeline

Project startedSep 2021
RERA registeredFeb 2022
Proposed completionJun 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

24 units across 6 batches
BuildingTypeArea sq mCount
SANGAM ENCLAVE3 BHK2344
SANGAM ENCLAVE3 BHK2324
SANGAM ENCLAVE3 BHK2314
SANGAM ENCLAVE3 BHK2394
SANGAM ENCLAVE3 BHK2394
SANGAM ENCLAVE3 BHK2304

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

MAA BHAWANI BUILDCON PVT. LTD.

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
4Projects
2Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
71 homeson the public record across 4 projects
7,669 sq mbuilt-up filed
3,302 sq mland declared
₹31.89 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MAA BHAWANI BUILDCON PVT. LTD.— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Danapur
Mauja (revenue village)
Sikandarpur
Village
DANAPUR
Address
Plot no- 623, khata no.- 268, tauzi no. 5855, thana no. 17, muza-shikandarpur, dist-patna
What’s nearby
SchoolsNo schools within 2km · Library 1.8km away
HealthcareNearest hospital 2.0km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 1.7km away
Getting around
Expressway 2.1 kmPrimary road 2.9 kmRailway line 4.1 kmRailway station 4.6km away (Danapur)Limited bus connectivity nearby
Water & environment
River 550 mCanal 711 mWater body 1.9 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹9.90 Cr declared to build 24 flats. What that works out to:

₹41.25 Lakhdeclared cost per flatall-in — land + construction
₹3,524/sq ftof built-up area₹37,931/sq m
36%of the cost is land₹3,054/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹14,463per sq yd
₹17,297per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Sikandarpur Nahar Se Purab”.
Highest rate
₹16,529 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹17,297 / sq m₹14,462 / sq yd
Res. Main Road₹19,768 / sq m₹16,529 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan

NAGAR PARISHAD DANAPUR NIZAMAT

Municipal / Corporation
Building Permit

The promised possession date (30 Jun 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

See every project approved by RERA Bihar

07

Other projects nearby

The register · within 25 km

359 residential projects still under way within 25 km. Step out ring by ring:

Of the 638 projects the radar draws within 6 km — every kind, every stage — 190 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

450 m awayMixed Development(residential and commercial)

SARASWATI ABODE

AADAYAE CONSTRUCTION PRIVATE LIMITED · DANAPUR · PATNA

Mar 2023registered
Dec 2027target completion
Declared cost₹6.88 CrScale20 flatsAuthorityRERA Bihar
510 m awayResidential/Group Housing

WINSOME PEARLZ

SANJEEV KUMAR · SIKANDERPUR · DANAPUR PATNA

May 2023registered
Jan 2028target completion
Declared cost₹17.93 CrScale52 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.