MahaRERA has de-registered this project — the registration was cancelled. This is a serious signal: the project is no longer under active RERA registration. Do not transact without independent legal verification of what happened and where the project stands.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Marol
Taluka
Andheri
District
Mumbai Suburban
Pincode
400059
Survey no.
CTS NO 47, 48, 51/A, 52, 53/A, 1702 OF VILLAGE MAROL
North boundary
DP ROAD
East boundary
SEVEN HILL HOSPITAL
South boundary
SAIFEE FOUNDATION PLOT
West boundary
MAROL PIPE LINE
What’s nearby
Schools2 schools within 500m · College or university 1.8km away
HealthcareHospital 204m away · 4 clinics within 1km
Lifestyle2 parks within 500m · Gym or sports centre 1.6km away · 19+ restaurants and cafes within 1km
ShoppingSupermarket 286m away · Convenience store within 1km · Bank 236m away
Getting around
Expressway 1.7 km · Andheri FlyoverPrimary road 330 m · Mathuradas Vasanji Road (Andheri Kurla Road)Railway line 2.4 kmMetro station 791m away (Sahar Road)Bus stop within 500m
Water & environment
Water body 814 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹1,45,770per sq yd
₹1,74,340per sq m
Which rate
residential flat (built)
Matched to
The rate published for “MAROL”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CTS NO 47, 48, 51/A, 52, 53/A, 1702 OF VILLAGE MAROL
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
246 commercial projects still under way within 25 km. Step out ring by ring:
Of the 2,700 projects the radar draws within 6 km — every kind, every stage — 65 are commercial projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
MarolCommercial
LEELA BUSINESS PARK - II
ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED
5 yr 2 mo
Oct 2024registered
Dec 2029target completion
Government Guidance Rate₹1,45,770/sq ydScale52 flatsAuthorityMahaRERA