HORIZON
Share

Redevelopment of bldg 5 and 6 Samrat and Pulkit CHS LTD CTS no 195 pt D N Ngr Mhada layout Andheri W

P51800005826 · MahaRERA · https://gethorizon.in/projects/redevelopment-of-bldg-5-and-6-samrat-andheri-oc6fjx5b

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
164 units
Mix
80 × 3 BHK · 42 × 2 BHK · 39 × 1 BHK · 3 × 4 BHK
Carpet area
45–150 sq mper-unit range, as filed
Floors
20
Buildings
2
Parking
223 spaces
Land area
2,854 sq m
Sanctioned built-up
5,669 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

164 units across 14 batches
TypeArea sq mCount
3 BHK10719
3 BHK10619
2 BHK6913
1 BHK4520
2 BHK748
3 BHK10822
1 BHK4517
4 BHK1503
1 BHK571
3 BHK11020
1 BHK561
2 BHK6011
2 BHK725
2 BHK715

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

A A Estates Pvt Ltd

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
4Projects
2Cities
2017–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
697 homeson the public record across 4 projects
28,680 sq mbuilt-up filed
13,999 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from A A Estates Pvt Ltd— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400053
Survey no.
CTS no 195 pt D N Nagar Mhada layout Andheri W Mumbai 53
North boundary
OB 7
East boundary
Internal Mhada layout road
South boundary
Bldg no 8A
West boundary
Bldg No 1 to 4 and 7A
What’s nearby
Schools1 school within 500m · College or university 1.3km away
HealthcareHospital 323m away · 5 clinics within 1km
LifestylePark 923m away · 24+ restaurants and cafes within 1km
ShoppingSupermarket 500m away · Convenience store within 1km · Bank 802m away
Getting around
Expressway 1.6 km · Andheri FlyoverPrimary road 232 m · Mathuradas Vasanji Road (Andheri Kurla Road)Railway line 2.4 kmMetro station 579m away (MIDC - Andheri)Bus stop within 500m
Water & environment
Water body 1.1 km · Dewool Talav
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

4,008 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,672 projects the radar draws within 6 km — every kind, every stage — 889 are residential projects still under way. This list keeps only those, and looks further out.

35 projects within 1 km — showing the nearest 6.

240 m awayOthers

Sky Vista

Delta Associates · Chakala · Andheri

Feb 2024registered
Jan 2029target completion
Government Guidance Rate₹1,58,572/sq ydScale140 flatsAuthorityMahaRERA
270 m awayResidential / Group Housing

RISHABRAJ TRIDENT

H RISHABRAJ REALTY · Andheri

Nov 2023registered
Aug 2028target completion
no escrow declaredAuthorityMahaRERA
320 m awayResidential / Group Housing

PEARL BLESSINGS

CHANDIWALA ENTERPRISES · Kondivita · Andheri

Feb 2024registered
Dec 2028target completion
Government Guidance Rate₹1,31,188/sq ydScale172 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

AQUINA

RAJIV CONSTRUCTION COMPANY DEVELOPERS · Greater Mumbai · Mumbai

Aug 2025registered
Dec 2027target completion
Scale82 flatsAuthorityMahaRERA
430 m awayResidential / Group Housing

SAKET

SIV REALTY · Kondivita · Andheri

Jun 2024registered
Dec 2026target completion
Government Guidance Rate₹1,66,356/sq ydScale23 flatsAuthorityMahaRERA
470 m awayResidential / Group Housing

PEARL HEAVEN IV

CHANDIWALA ENTERPRISES · Andheri

Jul 2021registered
Dec 2026target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.