Registration for Stilt floor + 3 Floors Residential Building with 12 dwelling units at Plot No. A-43 , Hindu Colony 5th Cross Street , Hindu Co-Operative Building Scheme , Nanganallur , Chennai - 600 061. Comprised in Old S.Nos. 32/1 , 31/1 , 31/2 , T.S.No. 15 , Block No.7 , Ward - D of Thalakananchery Village , Alandur Taluk , Chennai District.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
Schools3 schools within 1km · 5 educational institutions within 1km · Library 972m away
HealthcareHospital 148m away · 2 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 1.0km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 513m away · Convenience store within 1km · Bank 187m away
Getting around
Primary road 1.1 km · Mount - Medavakkam RoadRailway line 969 mRailway station 1.1km away (Meenambakkam)7 bus stops within 500m
Water & environment
Water body 806 m · Pannachiamman Koil Tank
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
Planning Permissionapproved 10 Jan 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
492 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 94 projects the radar draws within 6 km — every kind, every stage — 76 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.