This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Tower E to I on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road
Units
423 units
Mix
54 × 2rhk Type 6 · 53 × 2rhk Type 4 · 49 × 2rhk Type 7 · 43 × 2rhk Type 8 · 38 × 2 Rhk Type 8 · 32 × 2 Rhk Type 6 · 30 × 2 Rhk Type 7 · 30 × 2 Rhk Type 4 · 8 × Shop · 8 × 2rhk Type 12 · 8 × 3rhk Type 11 · 8 × 3rhk Type 2 · 8 × 2rhk Type 9 · 8 × 2 Rhk Type 12 · 8 × 3 Rhk Type 2 · 8 × 3 Rhk Type 11 · 8 × 2 Rhk Type 10 · 6 × Unit · 4 × 2rhk Type 5 · 4 × 2rhk Type 3 · 4 × 3rhk Type 1 · 4 × 2rhk Type 10
Carpet area
16–59 sq mper-unit range, as filed
Floors
25
Buildings
3
Parking
233 spaces
Land area
11,995 sq m
Sanctioned built-up
17,665 sq m
Recreational open space
5,880 sq m
Timeline
RERA registeredAug 2017
Proposed completionJul 2019
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
423 units across 32 batches
TypeArea sq mCount
Shop241
Shop171
Shop181
2rhk Type 44553
2rhk Type 5474
2rhk Type 12578
2rhk Type 64754
2rhk Type 74549
Shop161
3rhk Type 11578
2rhk Type 3454
Unit182
Unit162
Unit231
Shop231
2rhk Type 85743
Shop161
Shop171
3rhk Type 2578
3rhk Type 1574
Shop161
2rhk Type 9598
Unit171
2 Rhk Type 12578
2 Rhk Type 85738
2 Rhk Type 74530
2 Rhk Type 44530
2 Rhk Type 64732
3 Rhk Type 2578
3 Rhk Type 11578
2 Rhk Type 10578
2rhk Type 10574
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
S. No. 106 pt, 224/1A pt,224/1B pt, 104 pt, at Village Ghodbunder, Mira Road
North boundary
Survey No 105 DP Road 18m wide
East boundary
Wing C D CTS No 109pt
South boundary
Wing A B C D DP Road 18m Wide
West boundary
Survey 103 and 104pt
What’s nearby
Schools2 schools within 500m · 3 educational institutions within 1km
HealthcareHospital 154m away · 5 clinics within 1km · Doctor's clinic within 1km
LifestylePark 897m away · Playground within 500m · Gym or sports centre 1.8km away
ShoppingSupermarket 338m away · Bank 738m away
Getting around
Expressway 2.0 km · Western Express HighwayPrimary road 16 m · Mira Bhayandar RoadRailway line 1.5 km · Western Railway Virar to BorivaliMetro station 1.4km away (Kashigaon)3 bus stops within 500m
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Mira-Bhayandar (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
4 complaints · 4 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC006000000251398
3 Nov 2022
Order Approveddisposed
CC006000000161234
12 Oct 2019
Order Approveddisposed
CC006000000110823
7 Sep 2019
Order Approveddisposed
CC006000000022855
29 Jan 2018
Order Approveddisposed
Orders said not to be complied with
MahaRERA's own register
1 order
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000022855
1 Feb 2019
Court cases, as declared
Declared by the builder
7 cases
Number
Forum
Date
RCS/371/2017
The Court of Civil Judge Senior Division Thane
2017
311 of 2017
High court Bombay
2017
—
Hon Hogh Court Bombay
2017
—
MahaRERA Authority
2017
CC006000000022855 SONIA CHIBBER
MahaRERA Authority
2017
Show 2 more
Number
Forum
Date
CC/186/2016
State Consumer Dispute Redressal Commission Maharashtra at Mumbai
2016
CC/859/2016
State Consumer Dispute Redressal Commission Maharashtra at Mumbai
2016
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,657 residential projects still under way within 25 km. Step out ring by ring:
Of the 886 projects the radar draws within 6 km — every kind, every stage — 334 are residential projects still under way. This list keeps only those, and looks further out.
35 projects within 1 km — showing the nearest 6.
20 m awayResidential / Group Housing
Sai Empire
M/s Sai Shakti Associates · Mira-Bhayandar · Thane
3 yr 5 mo
Jul 2023registered
Dec 2026target completion
Government Guidance Rate₹60,034/sq ydScale114 flatsAuthorityMahaRERA