Registration for Stilt Floor + 3 Floors Residential Building with 9 Dwelling Units at Old Door No.10, New Door No.17,Veerabadran Street, Nungambakkam, Chennai comprised in Old R.S.No.198/16, New R.S.No.198/35 & 198/40, Block No.24 of Nungambakkam village within The Limits of Greater Chennai Corporation, Chennai District.
Registration no.
TN/29/Building/0218/2025
Timeline
RERA registeredJun 2025
Proposed completionAug 2032
TodaySep 2026
Complete project overview — done
02
Builder’s track record
TNRERA · Builder registration
SHREE VENKATESWARA HOMES & Hema Ramamurthy (Power Agent)
SHREE VENKATESWARA HOMES & Hema Ramamurthy (Power Agent)Promoter
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
Schools1 school within 500m · 11 educational institutions within 1km · College or university 864m away
HealthcareHospital 390m away · 11 clinics within 1km · Pharmacy within 1km
LifestylePark 1.4km away · Gym or sports centre 714m away · 50+ restaurants and cafes within 1km
Primary road 229 m · Dr MGR SalaiRailway line 1.3 kmMetro station 1.1km away (AG-DMS)3 bus stops within 500m
Water & environment
Canal 278 m · Mambalam CanalWater body 341 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
Planning Permissionapproved 25 Jun 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
452 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 213 projects the radar draws within 6 km — every kind, every stage — 163 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.