Registration of High Rise Building with 42.0m height consisting of Extended Basement Floor (Parking) + Stilt Floor (Parking) + 1st Floor to 11th Floor + 12th Floor part Residential building with 23 dwelling units and Gym in 12th Floor & Swimming Pool at Terrace floor availing Premium FSI at Old Door No.1, 2 & 2A, New Door No.1, 3 & 3/1 abutting Taylors Road, Kilpauk, Chennai - 600 010 in T.S. No.143/1, Block No.11 of Egmore Village, Egmore Taluk, Greater Chennai Corporation, Chennai District.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
SchoolsNearest school 2.0km away · Library 265m away
HealthcareHospital 393m away · 13 clinics within 1km · Pharmacy within 1km
LifestylePark 1.8km away · Gym or sports centre 1.8km away · 7 restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Convenience store within 500m · Bank 827m away
Getting around
Primary road 648 m · EVR Periyar SalaiRailway line 1.0 km · Beach Chengalpattu LineMetro station 715m away (Kilpauk)Bus stop within 1km
Water & environment
Water body 900 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
Planning Permissionapproved 24 Jul 2024 · 2 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
436 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 180 projects the radar draws within 6 km — every kind, every stage — 132 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.