All Infrastructure development work like roads, waterlines, sewerage network, internal electrification, street lights has been completed within time limit as specified in the Township Policy. Hence, extension of time for internal development works was not required.
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.0 kmRailway line 3.0 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 475 m · Jojari
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹6.36 Cr declared. What that works out to:
₹103/sq ftof plotted area₹1,111/sq m
12%of the cost is land₹12/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹3,579per sq yd
₹4,280per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Bhakarasani”.
Spread
₹3,579 – ₹11,497 per sq yd across the places it was taken over
This filing declares ₹1,111 per sq m of plotted area — 0.26× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jodhpur Development Authority
Development Authority
Layout Permitapproved 15 Sep 2017 · 9 yrs ago
The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jodhpur Development Authority
Development authority
Has approved 180 RERA projects — about 1 in 12 in Rajasthan.
a plotted-layout market — 12% apartments · 88% plotted layouts. Your plotted layout is this body's core business.
Builders
149
On record
853 flats · 17,456 plots
Reach
3 districts
Since
2017
More layout-heavy than Rajasthan overall — 88% plots here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
123 plotted projects still under way within 25 km. Step out ring by ring:
Of the 104 projects the radar draws within 6 km — every kind, every stage — 34 are plotted projects still under way. This list keeps only those, and looks further out.