HORIZONMarkets
01

Complete project overview

RERA Karnataka · Registration filing
Status
New Project Launch
Land area
13,455 sq m
Covered area
9,990 sq m
Open area
3,465 sq m

Timeline

Project startedOct 2021
RERA registeredNov 2021
Proposed completionOct 2026
TodayJul 2026
02

Builder’s track record

RERA Karnataka · Promoter registration

KARNATAKA SLUM DEVELOPMENT BOARD

Bengaluru UrbanBased in
200Projects
119Cities
2019–presentActive
Timelineevery project, start → promised completion
Construction of 759 DU's in Bangalore cityPMAY-HFA (U)Construction of 450 (G.F) Du's Including InfrastrConstruction of 450 (G.F) Du's Including InfrastrConstruction of 1588 DUs in SAGARA CityConstruction of 843 DU's at KGFCONSTRUCTION OF 860 GROUND FLOOR DWELLING UNITSConstruction of 230 Ground Floor Dwelling units iConstruction of 1530(GF) RamanagaraSARVAGNANAGAR762PMAY-HFAGANDHINAGAR933construction of 1329 Dus in mysorePMAY HFA (U)Construction of 829 (GF) Dus in Belagavi CityConstruction of 525 (G & G+3) DUs in Hubli city.construction of 400 houses @ Bhalki townPMAY-HFA(U)Construction of 655 GF DU's in Mysoreconstruction of 1500 houses in Bidar townConstruction of 700 G.F. D.U's in N.R.ConstituenyConstruction of 1188 (GF) in Ballari CityGovindarajanagara and Vijayanagara 1607 housesCONSTRUCTION OF 500 DUs IN MANGALORE CITYCONSTRUCTION OF 404 DUSConstruction of 801GF DUs in Harihara townCONSTRUCTION OF 250 GF DUs IN HANGAL TOWNCONSTRUCTION OF 250 GF DUs IN BYADAGI TOWNConstruction of 486(GF) DUs at ArakalugudConstruction of 500 DU'sConstruction of 1008 (G+2) Houses at Sira CityVIJAYANAGARA 1378 HOUSESConstruction of 1300(G+2) DUs in Hubli cityJAYANAGARA CHAMARAJAPETE CHIKKAPETE 931CONSTRUCTIN OF 210 DUS (GF) IN RONA TOWNPMAY HFA (U)CONSTRUCTION OF 500 (GF) DU's HOUSESConstruction of 213GF DUs at Haliyal town.PMAY HFA (U)Construction of 250 (GF) DUs under PMAY HFA (U)Construction of 250 (GF) DUs at Rabkavi BanhattiKamalapura 491 Du'sCONSTRUCTION OF 250 (GF) DU'S HOUSESConstruction of 250 housesBallari 1613 Du'sConstruction of 500 (G.F) Du's Including InfrastrConstruction of 500 GF Du's in SiddlaghattaConstruction of 242GF Du's in ChikkaballapuraPMAY-HFA (U)CONSTRUCTION OF 250 (GF) DUS UNDER PMAY HFA (U)Construction of 250 (GF) DUs Under PMAY HFA (U)Construction of 287GF dwelling units at DandeliPMAY HFA (U)PMAY-HFA (U)Construction of 250 houses at yadgiri city.PMAY-HFA (U)PMAY-HFA(U)Construction of 600 Houses at SrinivasapuraTekkalakote 268 Du'sPMAY-HFA( U)Construction of 200 (G.F) Du's Including Infrastrconstruction of 457 houses at T Dasarahalliconstruction of 893 GF DU's in Bangalore cityConstruction of 250 DU's in Soraba town.PMAY-HFA (U)CONSTRUCTIONS OF 300 DU'S IN PAVAGADA TOWNPMAY-HFA (U)construction of 250 (GF) houses at Maddur TownConstruction of 250(GF) Du's in nagamangala TownConstruction of 250 DU's in Shiralakoppa town.Construction of 500(GF) UNITSPMAY-HFAConstruction of 301(GF)DUs in Kudchi TownCONSTRUCTION OF 500 DU'S IN UDUPI CITYPMAY-HFA (U)Construction of 500 DU's at Mulabagiluconstruction of 250 (GF) DU's houses 01 slumPMAY HFA (U)Construction of 500 DUs in Kalghatagi town.construction of 250 (GF) housesConstruction of 500 D.U.'s in Hunsur TownCONSTRUCTION OF 250 (GF) HOUSESconstruction of 400 houses @ JewargiConstruction of 1800 (GF) DUs in Vijayapura cityConstruction of 1590 DU's in Shivamogga city.Construction of 500 (GF) DU's in kollegala townConstruction of 500 (GF) DUs in Bilagi townPMAY-HFAPMAY-HFAConstruction of 250 (GF) Dusconstruction of 500(GF) housesCONSTRUCTION OF 1000 (GF+1) DU'sConstruction of 449 (GF) DUs at Chikkodi TownCONSTRUCTION OF 300 (GF) DU'S IN BANNUR TOWNconstruction of 400 houses @ sedam townConstruction of 768 G+3 Houses at KR PuramPMAY HFA (U)Construction of 346 DU's ByatrayanpuraConstruction of 500 (GF)Dus in Chamarajnagar townChikkapete500chikkapetechamrajpete1155Construction of 200(GF) DUs in T narasipura TownConstruction of 500 (GF) DUs at ChannarayapatnaConstruction of 460 (GF)DUs in holenarasipuraCONSTRUCTION OF 280DU'SCONSTRUCTION OF 250 DU'SConstruction of 250(GF) Units at SakleshpuraConstruction of 327 (GF) Units including infrastGovindarajanagara 1845 housesSARVAGNANAGAR616Shanthinagar350BANGALORE SOUTH AND BASAVANAGUDI 1699construction of 825 G.F.DU's in N.R.ConstituencySHIVAJINAGAR 500 DUS BANGALOREGANDHINAGAR500CONSTRUCTION OF 500 DU S IN BHADRAVATHI CITYconstruction of 588 multi storied G+3 unitsCONSTRUCTION OF 300 (GF) DU'S IN NANJANGUDUConstruction of 485 DU'sConstruction of 300 DU's at ByatarayanpuraCONSTRUCTION OF 516(GF) INDIVIDUAL UNITSCONSTUCTION OF 1002 DUS IN CHANNAGIRI TOWNConstruction of 888 (G+3) Dus atRamanagaraConstruction of 625 Houses @ HubliDharwad centralConstruction of 200 houses in Nelamangla TownConstruction of 250 dus at sindhanuru townConstrution of 500 Houses in BasvangudiConstruction of 423 Houses in Vijayappura & DevanConstruction of 1450 Houses in Tumkur CityConstruction of 1200 (GF) HOUSES at BommanahalliConstruction of 1350 @ Hubli-Dharwad cityConstruction of 1200 houses in Tiptur CityConstruction of 1176 Houses at Dandeli townConstruction of 760 Dus in chikkaballapura TownConstruction of 300 houses in gubbi TownConstruction of 1430 Houses in CV Raman NagarDavangere_895@PMAY-HFAConstruction of 588 Houses at Nippani TownJAGALURU_300@PMAY-HFAChitradurga City -1226 dus under PMAY(U)-HFA.Chitradurga City-292 DUS under PMAY(U)-HFAHolalkere Town - 206 dus under PMAY(U)-HFA.Construction of 800 House in chikkanayakanahalliConstruction of 520 houses in Koratagere TownConstruction of 612 houses in Shidlaghatta TownDavangere North - 828 DUS under PMAY(U)-HFAConstruction of 500 Houses at NaragundConstruction of 798 @ AthaniConstruction of 235 Houses at Kundagola TownKOTTURU_411@PMAY-HFAConstruction of 250 Houses at Kalaghatagiconstruction 375 Dus at Navalgunda Town.Construction of 906 Houses at Mundagod townConstruction of 411 Houses at Kumta Town.Construction of 905 Houses at Belagavi NorthConstruction of 200 Houses at karwarConstruction of 469 @ KhanapuraConstruction of 300 Houses at Rona/GajendragadConstruction of 661 houses at Haliyal TownConstruction of 313 @ BhtkalaMolakalmuru Town_500 dus under PMAY-HFAConstruction of 863 Houses at Gadag CityConstruction of 1748 @ Belagavi SouthConstruction of 873 at Kuduchi Town.Construction of 643 Houses at Yelaburga townConstruction of 705 Houses at Bailhongal Town.Construction of 1035 @ RaybagConstruction of 275 Houses at Badami TownConstruction of 983 houses at Savadatti TownConstruction of 565 Houses at Rabakavi BanahattiConstruction of 400 @ SavadattiConstruction of 250 Houses at Teradal Town.Construction of 750 Dus at Davadurga TownKARNATAKA SLUM DEVELOMENT BOARDCONSTUCTION OF 1473 DUS IN SHAHABAD CITYCONSTRUCTION OF 552 g+2 DUS IN BASAVAKALYANA TOWNCONSTRUCTION OF 800 DUS IN BASAVAKALYANA TOWNHIRIYUR @ 988 DUS UNDER PMAY-HFAHonnali Town - 351 DUS under PMAY(U)-HFA.HOSADURGA 700 DUS under PMAY(U)-HFA.PMAY-HFA(U)Kamalapura_446 Dus under PMAY-HFA(U)Harapanahalli Town - 1156 DUS under PMAY(U)-HFAKampli Town - 500 DUS under PMAY(U)-HFA.Siruguppa Town - 598 DUS under PMAY(U)-HFAHuvinahadgali Town - 741 DUS under PMAY(U)-HFAConstruction of 455 Houses including infrastructuPMAY HFA (U)PMAY(HFA) RANEBENNUR 887PMAY 1500 MahalakshmipuramPMAY-HFA 500 GOVINDARAJANAGARAPMAY HFAPMAY_HFA@JEWARGI-750PMAY-HFA@Bidar-750PMAY HFAPMAY-HFA@BALLARI_609PMAY-HFA @BANKAPURA 454DUSPMAY-HFA @ HANAGAL 1000DUSPMAY 976 DHARWADPMAY HFA

Construction of 888 (G+3) Dus atRamanagara

Residential/Group Housing
Oct 2021started
Oct 2024target completion
₹53.19 Cr

PMAY-HFA(U)

Residential/Group Housing
Nov 2021started
Nov 2025target completion
₹50.99 Cr

PMAY 1500 Mahalakshmipuram

Residential/Group Housing
Jun 2022started
Dec 2025target completion
₹9,639

Construction of 300 DU's at Byatarayanpura

Residential/Group Housing
Jul 2021started
Dec 2025target completion
₹16.06 Cr

Construction of 500 (GF) DUs at Channarayapatna

Residential/Group Housing
Apr 2019started
Apr 2025target completion
₹25.55 Cr

Construction of 250(GF) Units at Sakleshpura

Residential/Group Housing
Apr 2019started
Dec 2023target completion
₹13.68 Cr

Construction of 486(GF) DUs at Arakalugud

Residential/Group Housing
May 2018started
May 2025target completion
₹25.90 Cr

Construction of 287GF dwelling units at Dandeli

Residential/Group Housing
Oct 2018started
Oct 2024target completion
₹16.16 Cr

Construction of 250 (GF) DUs under PMAY HFA (U)

Residential/Group Housing
Aug 2018started
Aug 2025target completion
₹13.75 Cr

Construction of 250 (GF) DUs at Rabkavi Banhatti

Residential/Group Housing
Aug 2018started
Aug 2025target completion
₹13.75 Cr

Construction of 449 (GF) DUs at Chikkodi Town

Residential/Group Housing
Feb 2019started
Feb 2025target completion
₹24.70 Cr

Construction of 301(GF)DUs in Kudchi Town

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹16.55 Cr

Construction of 829 (GF) Dus in Belagavi City

Residential/Group Housing
Jan 2018started
Jan 2023target completion
₹43.45 Cr

CONSTRUCTION OF 250 (GF) DUS UNDER PMAY HFA (U)

Residential/Group Housing
Oct 2018started
Oct 2025target completion
₹13.75 Cr

Construction of 250 (GF) DUs Under PMAY HFA (U)

Residential/Group Housing
Oct 2018started
Oct 2025target completion
₹13.75 Cr

Construction of 1800 (GF) DUs in Vijayapura city

Residential/Group Housing
Feb 2019started
Feb 2026target completion
₹99.00 Cr

Construction of 500 (GF) DUs in Bilagi town

Residential/Group Housing
Feb 2019started
Feb 2026target completion
₹27.50 Cr

Construction of 525 (G & G+3) DUs in Hubli city.

Residential/Group Housing
Jan 2018started
Jan 2024target completion
₹30.65 Cr

Construction of 500 DUs in Kalghatagi town.

Residential/Group Housing
Jan 2019started
Jan 2021target completion
₹28.35 Cr

Construction of 1590 DU's in Shivamogga city.

Residential/Group Housing
Feb 2019started
Jan 2024target completion
₹87.59 Cr

CONSTRUCTION OF 500 DU S IN BHADRAVATHI CITY

Residential/Group Housing
Dec 2020started
Jul 2023target completion
₹26.74 Cr

Construction of 1300(G+2) DUs in Hubli city

Residential/Group Housing
Jun 2018started
Jul 2024target completion
₹73.71 Cr

Construction of 250 DU's in Soraba town.

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹14.68 Cr

Construction of 250 DU's in Shiralakoppa town.

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹13.80 Cr

CONSTRUCTION OF 500 DUs IN MANGALORE CITY

Residential/Group Housing
May 2018started
May 2023target completion
₹28.62 Cr

Construction of 1588 DUs in SAGARA City

Residential/Group Housing
Jul 2017started
Jul 2022target completion
₹85.00 Cr

PMAY HFA

Residential/Group Housing
Dec 2022started
Dec 2024target completion
₹45.57 Cr

PMAY HFA

Residential/Group Housing
Dec 2022started
Dec 2024target completion
₹48.26 Cr

PMAY HFA

Residential/Group Housing
Dec 2022started
Apr 2024target completion
₹48.75 Cr

PMAY-HFA @BANKAPURA 454DUS

Residential/Group Housing
Dec 2022started
Mar 2026target completion
₹29.34 Cr

PMAY-HFA 500 GOVINDARAJANAGARA

Residential/Group Housing
Jul 2022started
Jan 2024target completion
₹3,395

CONSTRUCTION OF 516(GF) INDIVIDUAL UNITS

Residential/Group Housing
Jul 2021started
Jul 2026target completion
₹24.41 Cr

Construction of 1188 (GF) in Ballari City

Residential/Group Housing
Mar 2018started
Mar 2023target completion
₹56.82 Cr

construction of 1500 houses in Bidar town

Residential/Group Housing
Mar 2018started
Mar 2023target completion
₹63.02 Cr

construction of 588 multi storied G+3 units

Residential/Group Housing
Dec 2020started
Nov 2023target completion
₹33.10 Cr

CONSTRUCTIONS OF 300 DU'S IN PAVAGADA TOWN

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹15.75 Cr

Construction of 200(GF) DUs in T narasipura Town

Residential/Group Housing
Apr 2019started
Dec 2023target completion
₹10.20 Cr

CONSTRUCTIN OF 210 DUS (GF) IN RONA TOWN

Residential/Group Housing
Jul 2018started
Jun 2023target completion
₹11.35 Cr

PMAY-HFA

Residential/Group Housing
Feb 2019started
Jun 2023target completion
₹25.89 Cr

PMAY HFA (U)

Residential/Group Housing
Mar 2019started
Mar 2026target completion
₹16.50 Cr

JAYANAGARA CHAMARAJAPETE CHIKKAPETE 931

Residential/Group Housing
Jun 2018started
Jun 2024target completion
₹51.02 Cr

PMAY-HFA

Residential/Group Housing
Feb 2019started
Jun 2023target completion
₹18.54 Cr

Construction of 500 GF Du's in Siddlaghatta

Residential/Group Housing
Oct 2018started
Oct 2022target completion
₹25.60 Cr

Construction of 1008 (G+2) Houses at Sira City

Residential/Group Housing
May 2018started
Dec 2022target completion
₹55.44 Cr

Construction of 460 (GF)DUs in holenarasipura

Residential/Group Housing
Apr 2019started
Apr 2025target completion
₹23.50 Cr

Construction of 500 (GF) DU's in kollegala town

Residential/Group Housing
Feb 2019started
Feb 2024target completion
₹25.51 Cr

Construction of 500 DU's

Residential/Group Housing
May 2018started
May 2026target completion
₹26.25 Cr

construction of 893 GF DU's in Bangalore city

Residential/Group Housing
Dec 2018started
Dec 2022target completion
₹52.39 Cr

CONSTRUCTION OF 300 (GF) DU'S IN BANNUR TOWN

Residential/Group Housing
Feb 2019started
Feb 2024target completion
₹15.30 Cr

Construction of 500 (GF)Dus in Chamarajnagar town

Residential/Group Housing
Apr 2019started
May 2024target completion
₹25.30 Cr

CONSTRUCTION OF 500 DU'S IN UDUPI CITY

Residential/Group Housing
Jan 2019started
Jan 2023target completion
₹29.21 Cr

construction of 825 G.F.DU's in N.R.Constituency

Residential/Group Housing
Aug 2020started
Aug 2025target completion
₹42.66 Cr

Construction of 250 (GF) Dus

Residential/Group Housing
Feb 2019started
Feb 2023target completion
₹12.78 Cr

Govindarajanagara 1845 houses

Residential/Group Housing
Oct 2019started
Oct 2024target completion
₹100.00 Cr

Construction of 700 G.F. D.U's in N.R.Constitueny

Residential/Group Housing
Mar 2018started
Mar 2023target completion
₹41.54 Cr

construction of 1329 Dus in mysore

Residential/Group Housing
Dec 2017started
Dec 2023target completion
₹79.69 Cr

Construction of 500 D.U.'s in Hunsur Town

Residential/Group Housing
Feb 2019started
Feb 2024target completion
₹25.44 Cr

construction of 250 (GF) houses at Maddur Town

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹12.15 Cr

Construction of 250(GF) Du's in nagamangala Town

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹12.15 Cr

Construction of 655 GF DU's in Mysore

Residential/Group Housing
Mar 2018started
Mar 2024target completion
₹38.57 Cr

Construction of 242GF Du's in Chikkaballapura

Residential/Group Housing
Oct 2018started
Oct 2024target completion
₹11.38 Cr

CONSTRUCTION OF 300 (GF) DU'S IN NANJANGUDU

Residential/Group Housing
Dec 2020started
Dec 2024target completion
₹15.25 Cr

construction of 500(GF) houses

Residential/Group Housing
Feb 2019started
Dec 2023target completion
₹24.95 Cr

Construction of 759 DU's in Bangalore city

Residential/Group Housing
May 2017started
May 2025target completion
₹28.21 Cr

Construction of 500(GF) UNITS

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹24.30 Cr

construction of 457 houses at T Dasarahalli

Residential/Group Housing
Dec 2018started
Dec 2022target completion
₹26.83 Cr

SARVAGNANAGAR762

Residential/Group Housing
Sep 2017started
Sep 2022target completion
₹42.63 Cr

CONSTRUCTION OF 860 GROUND FLOOR DWELLING UNITS

Residential/Group Housing
Aug 2017started
Aug 2024target completion
₹50.44 Cr

PMAY-HFA(U)

Residential/Group Housing
Nov 2018started
Dec 2023target completion
₹10.94 Cr

PMAY HFA (U)

Residential/Group Housing
Aug 2018started
Aug 2025target completion
₹13.75 Cr

PMAY-HFA (U)

Residential/Group Housing
Dec 2018started
Dec 2025target completion
₹11.77 Cr

PMAY HFA (U)

Residential/Group Housing
Nov 2018started
Nov 2025target completion
₹13.75 Cr

construction of 400 houses @ Jewargi

Residential/Group Housing
Feb 2019started
Feb 2023target completion
₹21.88 Cr

Construction of 327 (GF) Units including infrast

Residential/Group Housing
Jun 2019started
Jun 2023target completion
₹16.00 Cr

Construction of 230 Ground Floor Dwelling units i

Residential/Group Housing
Sep 2017started
Sep 2022target completion
₹10.84 Cr

SARVAGNANAGAR616

Residential/Group Housing
Dec 2019started
Dec 2024target completion
₹33.83 Cr

Chikkapete500

Residential/Group Housing
Apr 2019started
Apr 2024target completion
₹27.40 Cr

CONSTRUCTION OF 280DU'S

Residential/Group Housing
Apr 2019started
Apr 2023target completion
₹14.92 Cr

Shanthinagar350

Residential/Group Housing
Jan 2020started
Jan 2026target completion
₹19.18 Cr

chikkapetechamrajpete1155

Residential/Group Housing
Apr 2019started
Apr 2026target completion
₹63.29 Cr

CONSTRUCTION OF 250 DU'S

Residential/Group Housing
Apr 2019started
Apr 2025target completion
₹12.78 Cr

CONSTRUCTION OF 404 DUS

Residential/Group Housing
May 2018started
May 2024target completion
₹20.64 Cr

CONSTRUCTION OF 500 (GF) DU's HOUSES

Residential/Group Housing
Aug 2018started
Jan 2023target completion
₹27.35 Cr

Construction of 450 (G.F) Du's Including Infrastr

Residential/Group Housing
May 2017started
Dec 2023target completion
₹21.94 Cr

Construction of 500 (G.F) Du's Including Infrastr

Residential/Group Housing
Oct 2018started
Oct 2024target completion
₹25.60 Cr

Construction of 200 (G.F) Du's Including Infrastr

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹10.24 Cr

PMAY-HFA(U)

Residential/Group Housing
Feb 2018started
Jun 2023target completion
₹46.89 Cr

Ballari 1613 Du's

Residential/Group Housing
Sep 2018started
Sep 2023target completion
₹87.55 Cr

PMAY-HFA (U)

Residential/Group Housing
Dec 2018started
Dec 2023target completion
₹26.80 Cr

Construction of 768 G+3 Houses at KR Puram

Residential/Group Housing
Mar 2019started
Dec 2024target completion
₹45.16 Cr

Construction of 600 Houses at Srinivasapura

Residential/Group Housing
Nov 2018started
Nov 2023target completion
₹30.36 Cr

Kamalapura 491 Du's

Residential/Group Housing
Sep 2018started
Oct 2023target completion
₹26.65 Cr

Tekkalakote 268 Du's

Residential/Group Housing
Nov 2018started
Oct 2023target completion
₹14.55 Cr

PMAY-HFA

Residential/Group Housing
Oct 2017started
Jun 2023target completion
₹15.92 Cr

Construction of 801GF DUs in Harihara town

Residential/Group Housing
May 2018started
May 2023target completion
₹43.29 Cr

PMAY-HFA (U)

Residential/Group Housing
May 2017started
Dec 2023target completion
₹14.27 Cr

CONSTRUCTION OF 250 (GF) HOUSES

Residential/Group Housing
Feb 2019started
Feb 2024target completion
₹13.68 Cr

construction of 250 (GF) houses

Residential/Group Housing
Feb 2019started
Jul 2023target completion
₹13.67 Cr

CONSTRUCTION OF 1000 (GF+1) DU's

Residential/Group Housing
Feb 2019started
Feb 2023target completion
₹54.70 Cr

CONSTRUCTION OF 250 GF DUs IN HANGAL TOWN

Residential/Group Housing
May 2018started
May 2023target completion
₹13.99 Cr

construction of 250 (GF) DU's houses 01 slum

Residential/Group Housing
Jan 2019started
Jan 2023target completion
₹13.68 Cr

Construction of 450 (G.F) Du's Including Infrastr

Residential/Group Housing
May 2017started
Dec 2023target completion
₹21.95 Cr

CONSTRUCTION OF 250 (GF) DU'S HOUSES

Residential/Group Housing
Sep 2018started
Sep 2023target completion
₹13.68 Cr

Construction of 250 houses

Residential/Group Housing
Sep 2018started
Oct 2023target completion
₹13.68 Cr

CONSTRUCTION OF 250 GF DUs IN BYADAGI TOWN

Residential/Group Housing
May 2018started
May 2023target completion
₹13.99 Cr

construction of 400 houses @ Bhalki town

Residential/Group Housing
Feb 2018started
Feb 2023target completion
₹21.88 Cr

construction of 400 houses @ sedam town

Residential/Group Housing
Mar 2019started
Mar 2023target completion
₹21.88 Cr

Construction of 213GF DUs at Haliyal town.

Residential/Group Housing
Aug 2018started
Aug 2024target completion
₹11.99 Cr

PMAY-HFA (U)

Residential/Group Housing
Oct 2018started
Jun 2026target completion
₹33.00 Cr

PMAY HFA (U)

Residential/Group Housing
Jul 2018started
Jul 2025target completion
₹27.50 Cr

PMAY HFA (U)

Residential/Group Housing
Jan 2018started
Jan 2025target completion
₹46.01 Cr

PMAY HFA (U)

Residential/Group Housing
Jan 2019started
Jan 2026target completion
₹32.56 Cr

Construction of 843 DU's at KGF

Residential/Group Housing
Aug 2017started
Aug 2023target completion
₹39.83 Cr

Construction of 500 DU's at Mulabagilu

Residential/Group Housing
Jan 2019started
Jan 2024target completion
₹25.60 Cr

Govindarajanagara and Vijayanagara 1607 houses

Residential/Group Housing
Mar 2018started
Dec 2024target completion
₹88.39 Cr

Construction of 1530(GF) Ramanagara

Residential/Group Housing
Sep 2017started
Sep 2024target completion
₹75.57 Cr

VIJAYANAGARA 1378 HOUSES

Residential/Group Housing
Jun 2018started
Jun 2024target completion
₹75.51 Cr

BANGALORE SOUTH AND BASAVANAGUDI 1699

Residential/Group Housing
Feb 2020started
Feb 2024target completion
₹99.47 Cr

GANDHINAGAR933

Residential/Group Housing
Nov 2017started
Nov 2025target completion
₹54.83 Cr

Construction of 346 DU's Byatrayanpura

Residential/Group Housing
Apr 2019started
Mar 2026target completion
₹18.96 Cr

Construction of 485 DU's

Residential/Group Housing
Jun 2021started
Jun 2026target completion
₹2,657
Builder DNAthe whole portfolio, summed
1,002 homeson the public record across 200 projects
56,49,392 sq mland declared
₹7199.89 Crdeclared build cost

Build cost is what the promoter declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
KSDB - Karnataka State Slum Development Board189 of 200 projects
Local Planning AuthorityTown & Country Planning (DTCP)10 of 200 projects
BBMP - Bruhat Bengaluru Mahanagara PalikeMunicipal / Corporation1 of 200 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Karnataka · Registration filing
Taluk
Kadur
District
Bengaluru Urban
Pincode
560079
Address
Jalgere beedi, Maratha colony, A.K.colony, , Bellary Camp, Bhovi colony
What’s nearby
SchoolsNearest school 1.1km away · College or university 1.0km away · Library 887m away
HealthcareHospital 195m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 1.4km away · Gym or sports centre 939m away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 139m away · Convenience store within 500m · Bank 403m away
Getting around
Expressway 1.1 km · Sumanahalli FlyoverPrimary road 163 m · Magadi RoadRailway line 2.8 kmMetro station 1.8km away (Vijayanagar)Bus stop within 500m
Water & environment
Water body 926 m · Nagarbhavi Thorai
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹20.39 Cr declared. What that works out to:

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

RERA Karnataka · Approved building plan

KSDB - Karnataka State Slum Development Board

Building Permit
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

KSDB

Planning authority · Karnataka State Slum Development Board

Has approved 282 RERA projects3.2% of Karnataka.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
31
On record
1,002 flats · 0 plots
Reach
141 taluks
Since
2019

More apartment-heavy than Karnataka overall — 100% apartments here vs 62% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

Complaints register

None on record with RERA Karnataka against this project.

Only disputes escalated to the authority appear on the register — a private disagreement never filed here would not. A count from the public record, not a verdict.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.