Detailed Report

EKAM BUILDMART

RAJ/P/2019/1162 · RAJ-RERA · https://gethorizon.in/projects/ekam-buildmart-ladpura-kota-xricba6m

01

Complete project overview

RAJ-RERA · Registration filing
Land area
9,902 sq m
Description
The finish date committed for the project as per Form B is 31.12.2023 which is beyond the validity period of the approved maps. The promoter takes the responsibility to obtain the necessary extension form the competent authority.

Timeline

RERA registeredDec 2019
Construction startJan 2020
Proposed completionDec 2023
TodaySep 2026
02

Builder’s track record

RAJ-RERA · Builder registration

EKAM BUILDMART

OrganisationPromoter type
Kota, RajasthanBased in
1Projects
1City
2019–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 12 new projects last year
  • 136 nearby projects
1 km radius · coordinates as filed · 25.2176, 75.9204 · © OpenStreetMap contributors
Address
KH. NO. 2366/1076 , 2367/1077, VILLAGE CHANDERSAL , VINAYAK TRIVENI DHAM, SOGARIYA SE CHANDERSAL ROAD, Ladpura, Kota, 324002
Taluka
Ladpura
District
Kota
Pincode
324002
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.2km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.1 km · Kota BypassRailway line 936 mRailway station 2.4km away (Sogariya)Limited bus connectivity nearby
Water & environment
River 2.3 km · ChandloiWater body 2.9 kmCanal 3.0 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹27.83 Cr declared. What that works out to:

1%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~56 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~56 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Jan 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~56 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Rajasthan registration department

In Rajasthan it’s called the DLC rate.

No government guidance rate is shown for this project.

Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 23 Dec 2019 · 6 yrs ago

The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

08

Other projects nearby

The register · within 25 km

27 residential projects still under way within 25 km. Step out ring by ring:

Of the 136 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.

2 projects between 1 and 3 km — showing the nearest 2.

2.7 km awayGroup Housing

GOLD BELLAGIO

KGV INFRA PRIVATE LIMITED · Ladpura · Kota

Oct 2024registered
Oct 2028target completion
Declared cost₹47.50 CrScale78 flatsAuthorityRAJ-RERA
2.8 km awayGroup Housing

Astitva Vision

Astitva Estates Private Limited · Ladpura · Kota

May 2025registered
Mar 2027target completion
Declared cost₹4.20 CrScale20 flatsAuthorityRAJ-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RAJ-RERA, as the builder submitted it.
  2. 02Builder's track record
    • RAJ-RERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RAJ-RERA filing.
    • Coordinates: as filed with RAJ-RERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Rajasthan's published schedules.
  6. 06Planning authority
    • RAJ-RERA: the approved building plan, as filed.
  7. 07Complaints & litigation
    • Court cases, as declared by the builder, in its RAJ-RERA filing.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/ekam-buildmart-ladpura-kota-xricba6m.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.