1 extension on record — latest to 30 Jun 2021declared reason: force majeure
Description
The total area of the land is 3.34 Hectare (Khasra No-62) out of which area of 1.99 Hectare ( Khara No-62 Part) is approved for residential purpose as per 90A order dated 28/09/2018. The same has been enclosed under land title document. By mistake it has been written as Khsara no 62 on sanction map & approval letter however the said project is to be read as Khasra No-62 (Part) and to be registered in RERA as Khasra No.62(Part). The affidavit regarding the same based on the facts has been uploaded under copy of layout approval-:others. As per Sanction layout total Area of the project is 19,900Sq. Meter however the other table depicting the area calculation has been crossed by the UIT, Kota is to be ignored. The finish date committed for the project as per the form B is 30/06/2020. This is beyond the validity period of the approved maps. Promoter takes the responsibility to obtain the necessary extension from the competent authority. Plot No-85, 86 & 87 is not being depicted on sanctioned layout.
As per the U.I.T., Kota layout plan approval letter no. F-7/D.T.P./2018/393 dated 17/12/2018 point no. 11 and remark put on the copy of approved layout plan “For Internal development in the scheme, 12.5 Percent saleable plot numbers 2,3,30,41,42,43,44,62,63,65,68,82,83 &84 having total area 14,860sq. feet is mortgage to U.I.T., Kota. These Plots are not to be sold without permission of U.I.T., Kota
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 764 m · Kota BypassPrimary road 3.4 kmRailway line 4.1 km · Mumbai - Delhi RailwayRailway station 5.0km away (Chandresal)Limited bus connectivity nearby
Water & environment
River 982 mCanal 4.0 kmWater body 4.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹11.00 Cr declared. What that works out to:
₹514/sq ftof plotted area₹5,528/sq m
36%of the cost is land₹187/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~80 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~80 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~80 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RAJ-RERA · Approved building plan
Layout Permitapproved 8 Mar 2019 · 7 yrs ago
The promised possession date (30 Jun 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
88 plotted projects still under way within 25 km. Step out ring by ring:
Of the 150 projects the radar draws within 6 km — every kind, every stage — 53 are plotted projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
240 m awayPlotted Development
NIRMAL PARK
N C HERITAGE RESORTS PRIVATE LIMITED · Ladpura · Kota
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Rajasthan's published schedules.
06Planning authority
RAJ-RERA: the approved building plan, as filed.
07Complaints & litigation
RAJ-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/coral-park-d-ladpura-kota-jqz0rftf.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.