1). As per Township Policy 2010, 14 Plots (Plot No. 85 to 89 and 91 to 97 And 101, 102) having Total area of 1150.93 Sq. Mtrs equal to 12.5% of saleable area have been kept as mortgage under KDA Kota. These plots would be allotted after the internal development work of project is completed and development charges are deposited with KDA Kota. 2). Since it is a plotted development project therefore no parking details are required. 3. The Total Open Area 5889.78 Square meters (the area related with Garden/SWM/MT 986.52 Sq Mtr, Road 4903.25 Sq Mtr. ) the Facility area 286.06 4. Plot No. 29 is mearged in Facility, So Total 102 Plots and 10 I. C. Shops, Now Total Saleable Units are 112.
Timeline
Construction startApr 2025
RERA registeredMay 2025
Proposed completionOct 2026
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
112 plots across 27 batches
TypeArea sq mCount
Plot701
Plot601
Plot671
Plot561
Plot882
Plot671
Plot631
Plot441
Plot1441
Plot1021
Plot911
Plot862
Plot9310
Plot9336
Plot1126
Plot862
Plot8114
Plot9815
Plot741
Plot561
Plot882
Plot1411
Plot752
Plot653
Plot673
Plot1001
Plot791
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 4.1 km · Kota BypassRailway line 1.2 kmRailway station 2.2km away (Sogariya)Limited bus connectivity nearby
Water & environment
River 2.5 km · ChandloiWater body 2.6 kmCanal 2.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹11.70 Cr declared to build 112 plots. What that works out to:
₹10.45 Lakhdeclared cost per plotall-in — land + construction
₹715/sq ftof plotted area₹7,696/sq m
79%of the cost is land₹568/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹5,426per sq yd
₹6,490per sq m
Which rate
residential, interior plot
Matched to
The rate published for “SOGARIYA”.
Highest rate
₹8,612 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹6,490 / sq m
₹5,426 / sq yd
road-facing
₹8,580 / sq m
₹7,174 / sq yd
41–60 ft road
₹9,440 / sq m
₹7,893 / sq yd
61–99 ft road
₹9,870 / sq m
₹8,253 / sq yd
100 ft+ road
₹10,300 / sq m
₹8,612 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
This filing declares ₹7,696 per sq m of plotted area — 1.19× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Layout Permitapproved 13 May 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
87 plotted projects still under way within 25 km. Step out ring by ring:
Of the 146 projects the radar draws within 6 km — every kind, every stage — 50 are plotted projects still under way. This list keeps only those, and looks further out.