1). As per Township Policy 2010, 13 Plots (Plot No. 56 to 62 and 77 to 82) having Total area of 1172.30 Sq. Mtrs equal to 12.5% of saleable area have been kept as mortgage under KDA Kota. These plots would be allotted after the internal development work of project is completed and development charges are deposited with KDA Kota. 2). Since it is a plotted development project therefore no parking details are required. 3. The Total Open Area 6405.30 Square meters and the area related with Park/SWM/MT 866.82Sq Mtr, Road 5538.47 Sq Mtr. Layout plan approved by KDA, Kota vide letter no F-7/D.T.P./2024/2420 on 02.01.2025 and Revised Letter No. F-7/D.T.P./2025/2842 on 16.06.2025 In This Revised Letter Only Plot Size Changed, Plot No. are 42 To 55, and 63 to 76.
Timeline
Construction startJan 2025
RERA registeredJun 2025
Proposed completionJul 2026
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
87 plots across 39 batches
TypeArea sq mCount
Plot9321
Plot1022
Plot1127
Plot934
Plot1141
Plot935
Plot1321
Plot10511
Plot1231
Plot1121
Plot1821
Plot731
Plot1051
Plot1371
Plot1281
Plot1281
Plot1361
Plot1255
Plot661
Plot1091
Plot1291
Plot891
Plot1391
Plot1321
Plot901
Plot2171
Plot781
Plot1221
Plot1371
Plot1231
Plot671
Plot711
Plot1271
Plot701
Plot1181
Plot891
Plot781
Plot1091
Plot1201
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.6 km · Kota BypassPrimary road 4.6 kmRailway line 1.6 kmRailway station 3.2km away (Sogariya)Limited bus connectivity nearby
Water & environment
Canal 1.1 kmWater body 1.2 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹18.50 Cr declared to build 87 plots. What that works out to:
₹21.26 Lakhdeclared cost per plotall-in — land + construction
₹1,102/sq ftof plotted area₹11,859/sq m
81%of the cost is land₹893/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹5,518per sq yd
₹6,600per sq m
Which rate
residential, interior plot
Matched to
The rate published for “RANGTALAB URF KALATALAB”.
Highest rate
₹8,830 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹6,600 / sq m
₹5,518 / sq yd
road-facing
₹8,800 / sq m
₹7,358 / sq yd
41–60 ft road
₹9,680 / sq m
₹8,094 / sq yd
61–99 ft road
₹10,120 / sq m
₹8,462 / sq yd
100 ft+ road
₹10,560 / sq m
₹8,830 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
This filing declares ₹11,859 per sq m of plotted area — 1.80× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Layout Permitapproved 28 Jun 2025 · 1 yr ago
The promised possession date (2 Jul 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
87 plotted projects still under way within 25 km. Step out ring by ring:
Of the 176 projects the radar draws within 6 km — every kind, every stage — 61 are plotted projects still under way. This list keeps only those, and looks further out.