HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

ELIXIR ONE

PR1180002502474 · MahaRERA · https://gethorizon.in/projects/elixir-one-mulund-w-ctso-mulund-m7khz8bq

01

Complete project overview

MahaRERA · Registration filing
Units
24 units
Floors
7
Buildings
2
Parking
34 spaces
Land area
803 sq m
Sanctioned built-up
1,486 sq m

Timeline

RERA registeredFeb 2026
Proposed completionDec 2028
TodaySep 2026
Construction progress
Flat fit-out0%
External finishes0%
OC-readiness0%
Water Supply0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Open Parking0%
Internal finishes10%
Stairs & lifts25%
Stilt floor50%
Superstructure50%
Excavation100%
Basement (if any)100%
Plinth100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

ELIXIR PROPERTIES LLP

Limited Liability PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 255 new projects last year
  • 2,527 nearby projects
1 km radius · coordinates as filed · 19.0649, 72.8839 · © OpenStreetMap contributors
Village
Mulund W
Taluka
CTSO Mulund
District
Mumbai Suburban
Pincode
400080
Survey no.
1454A
North boundary
PALNIVAS BUILDING
East boundary
9 METER WIDE SANCTIONED RL
South boundary
UNDER CONSTRUCTION BUILDING
West boundary
GROUND AND 13 FLOOR BUILDING
What’s nearby
Schools1 school within 1km
HealthcareHospital 253m away · 2 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.3km away · Gym or sports centre 1.6km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 211m away · Bank 135m away
Getting around
Expressway 536 m · Santa Cruz – Chembur Link RoadPrimary road 977 m · Lal Bahadur Shastri MargRailway line 275 m · Central Railway (Harbour Line)Railway station 474m away (Kurla)4 bus stops within 500m
Water & environment
Water body 86 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,22,033per sq yd
₹1,45,950per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Mulund W”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 1454A
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,228 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,527 projects the radar draws within 6 km — every kind, every stage — 806 are residential projects still under way. This list keeps only those, and looks further out.

43 projects within 1 km — showing the nearest 6.

140 m awayResidential / Group Housing

152 Samruddhi

Aditya Samruddhi Enterprises · Kurla

Nov 2025registered
Dec 2029target completion
AuthorityMahaRERA
170 m awayResidential / Group Housing

OM NANDADEEP CO-OP. HSG. SOC. LTD.

OM NANDADEEP CO-OP HOUSING SOCIETY LIMITED · Kurla

Jan 2024registered
Oct 2026target completion
Scale65 flatsAuthorityMahaRERA
170 m awayResidential / Group Housing

SAYBA ELEGANT

STAR AURA · Kurla

Jul 2023registered
Mar 2026target completion
Scale115 flatsAuthorityMahaRERA
170 m awayMixed

SAYBA CRYSTAL

AMOOL ENTERPRISES · Kurla

Jul 2024registered
May 2027target completion
Scale185 flatsAuthorityMahaRERA
170 m awayResidential / Group Housing

SAYBA ROYAL

M/S. STAR RISE · Kurla

Jan 2025registered
Dec 2026target completion
Scale152 flatsAuthorityMahaRERA
170 m awayMixed

Sayba Iris

STAR RISE · Kurla

Jan 2026registered
Jan 2029target completion
1 open complaintScale151 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/elixir-one-mulund-w-ctso-mulund-m7khz8bq.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.