Timeline
Building permit grantedOct 2021
Proposed completionSep 2024
TodaySep 2026
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitCarpet sq m
1AFirst77.62
1BFirst77.02
1CFirst63.80
1DFirst77.14
1EFirst74.38
2ASecond77.62
2BSecond77.02
2CSecond63.80
2DSecond77.14
2ESecond74.38
3AThird77.62
3BThird77.02
3CThird63.80
3DThird77.14
3EThird74.38
4AForth77.62
4BForth77.02
4CForth63.80
4DForth77.14
4EForth74.38
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
All 20 units as filed, two to a row · areas in sq m
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Greater Hyderabad Municipal Corporation (GHMC)Municipal / Corporation4 of 9 projects
Hyderabad Metropolitan Development Authority (HMDA)Urban Development Authority2 of 9 projects
Ahmedabad Municipal CorporationMunicipal / Corporation1 of 9 projects
Talegaon Dabhade Municipal CouncilMunicipal Council1 of 9 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 2.8 km · Ratu RoadRailway line 1.7 kmRailway station 2.0km away (Argora)Limited bus connectivity nearby
Water & environment
Water body 563 m · argora pondRiver 640 m · Harmu
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Jharkhand registration department
In Jharkhand it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Jharkhand's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
JHARERA · Approved building plan
Building Permitapproved 9 Oct 2021 · 4 yrs ago
The promised possession date (25 Sep 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
JHARERA · public record
Complaints register
Not published. JHARERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to JHARERA
Litigation
None declared in this filing
Only what the builder declared, or what JHARERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with JHARERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
273 residential projects still under way within 25 km. Step out ring by ring:
Of the 239 projects the radar draws within 6 km — every kind, every stage — 103 are residential projects still under way. This list keeps only those, and looks further out.
No government guidance rate could be matched to this project from Jharkhand's published schedules.
05Planning authority
JHARERA: the approved building plan, as filed.
06Complaints & litigation
JHARERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/laxmi-mohan-residency-argora-oloh7xmg.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.