HORIZON
Share

BRAJ-MADHURI RESIDENCY

JHARERA/PROJECT/90/2021 · JHARERA · https://gethorizon.in/projects/braj-madhuri-residency-olkqsdv0

01

Complete project overview

JHARERA · Registration filing
Units
11 units
Carpet area
47–119 sq mper unit, as filed
Parking
11 spaces11 covered · 0 open
Amenities declared
Road · Drinking water · Water supply · Sewage & drainage · Electricity · Fire fighting · Emergency evacuation · Solid waste · Rain-water harvesting · Renewable energy

Timeline

Building permit grantedFeb 2019
Proposed completionFeb 2022
TodaySep 2026

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitCarpet sq m
1GROUND FLOOR65.92
2GROUND FLOOR62.72
11ST FLOOR110.06
21ST FLOOR46.85
31ST FLOOR80.56
12ND FLOOR119.48
22ND FLOOR54.66
32ND FLOOR89.34
13RD FLOOR119.48
23RD FLOOR54.66
33RD FLOOR89.34

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.

02

Builder’s track record

JHARERA · Builder registration

SHIVANIK BUILDCON

Partnership / LLPPromoter constitution
1Projects
1Cities
2019–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

JHARERA · Registration filing
Address
ARYA PURI, RATU ROAD, RANCHI,
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.1km away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.5km away · Mall 1.2km away · Convenience store within 1km
Getting around
Primary road 1.1 km · Ratu RoadRailway line 2.5 kmRailway station 2.6km away (Argora)Limited bus connectivity nearby
Water & environment
River 495 m · Harmu
distances only — not a flood assessment
04

Government Guidance Rate

Jharkhand registration department

In Jharkhand it’s called the MVR (minimum value register) rate.

No government guidance rate is shown for this project.

Jharkhand's government guidance rates aren't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

JHARERA · Approved building plan
Building Permitapproved 28 Feb 2019 · 7 yrs ago

The promised possession date (28 Feb 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

275 residential projects still under way within 25 km. Step out ring by ring:

Of the 295 projects the radar draws within 6 km — every kind, every stage — 136 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

770 m awayMixed

Prarthana Majestic

PRARTHANA CREATIONS PRIVATE LIMITED · Town

Feb 2026registered
Dec 2028target completion
Declared cost₹2.60 CrScale28 flatsAuthorityJHARERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — JHARERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — JHARERA does not publish a complaints register. This read cannot speak to them either way.