Road · Drinking water · Water supply · Sewage & drainage · Electricity · Fire fighting · Emergency evacuation · Solid waste · Rain-water harvesting · Renewable energy
Timeline
Building permit grantedAug 2019
Proposed completionAug 2022
TodaySep 2026
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitCarpet sq m
01GROUND FLOOR23.23
02GROUND FLOOR26.94
03GROUND FLOOR10.41
04GROUND FLOOR9.29
05GROUND FLOOR23.23
06GROUND FLOOR21.37
07GROUND FLOOR6.69
101FIRST FLOOR75.53
102FIRST FLOOR83.15
103FIRST FLOOR85.01
104FIRST FLOOR78.69
201SECOND FLOOR78.22
202SECOND FLOOR86.12
203SECOND FLOOR87.70
204SECOND FLOOR81.38
301THIRD FLOOR78.22
302THIRD FLOOR86.12
303THIRD FLOOR87.70
304THIRD FLOOR81.38
401FOURTH FLOOR78.22
402FOURTH FLOOR86.12
403FOURTH FLOOR87.70
404FOURTH FLOOR81.38
501FIFTH FLOOR78.22
502FIFTH FLOOR86.12
503FIFTH FLOOR87.70
504FIFTH FLOOR81.38
601SIXTHFLOOR78.22
602SIXTH FLOOR86.12
603SIXTH FLOOR87.70
604SIXTH FLOOR81.38
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 4.3 km · upper bazar roadRailway line 459 mRailway station 889m away (Argora)Limited bus connectivity nearby
Water & environment
Water body 928 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Jharkhand registration department
In Jharkhand it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Jharkhand's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
JHARERA · Approved building plan
Building Permitapproved 14 Aug 2019 · 7 yrs ago
The promised possession date (14 Aug 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
JHARERA · public record
Complaints register
Not published. JHARERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to JHARERA
Litigation
None declared in this filing
Only what the builder declared, or what JHARERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with JHARERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
272 residential projects still under way within 25 km. Step out ring by ring:
Of the 231 projects the radar draws within 6 km — every kind, every stage — 102 are residential projects still under way. This list keeps only those, and looks further out.
28 projects between 1 and 3 km — showing the nearest 6.