This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.
01
Complete project overview
RERA Assam · Registration filing
Registration category
ONGOINGnew vs ongoing at registration
Land area
1,338 sq m
Local land measure
1 bigha
RERA validity
30 Apr 2023this validity has passed
Timeline
RERA registeredJun 2019
Proposed completionDec 2022
TodaySep 2026
Construction progress
0% overall, as filed
Self-declared % complete as filed with RERA Assam when this ongoing project was registered — a snapshot at registration, not a live tracker.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 9 educational institutions within 1km · College or university 119m away
HealthcareHospital 298m away · 41 clinics within 1km · Pharmacy within 500m
LifestylePark 1.1km away · Gym or sports centre 697m away · 71+ restaurants and cafes within 1km
ShoppingSupermarket 592m away · Mall 303m away · Convenience store within 500m
Getting around
Primary road 39 m · G.S. RoadRailway line 1.4 kmRailway station 1.9km away (Guwahati)3 bus stops within 500m
Water & environment
Water body 500 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
Guwahati Municipal Corporation
Municipal Corporation
Building Permitapproved 13 Jun 2016 · 10 yrs ago
The promised possession date (31 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Guwahati Municipal Corporation
Municipal corporation / board
Has approved 604 RERA projects — about 1 in 1 in Assam, more than any other body in the state.
an apartments market — 98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.
Builders
488
On record
45,695 flats · 10,758 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
375 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 514 projects the radar draws within 6 km — every kind, every stage — 192 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.