This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
PRITHIVI SHOURYA SKY ONE
Units
83 units
Mix
48 × 2 BHK · 35 × 1 BHK
Carpet area
38–51 sq mper-unit range, as filed
Floors
15
Parking
76 spaces
Land area
2,884 sq m
Sanctioned built-up
303 sq m
Timeline
RERA registeredSep 2017
Proposed completionJul 2019
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
83 units across 5 batches
TypeArea sq mCount
1 BHK3824
1 BHK433
1 BHK458
2 BHK5124
2 BHK5124
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.2km away · 5 educational institutions within 1km · College or university 868m away
HealthcareHospital 897m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 524m away · Gym or sports centre 1.5km away · 8 restaurants and cafes within 1km
ShoppingSupermarket 940m away · Mall 1.5km away · Convenience store within 1km
Getting around
Expressway 1.9 km · Katraj - Dehu Road BypassPrimary road 49 mRailway line 1.4 km · Mumbai–Pune RailwayRailway station 1.4km away (Akurdi Railway Station)Bus stop within 1km
Water & environment
Water body 624 mRiver 753 m · Pavana River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹58,077per sq yd
₹69,460per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 103 divisions of “Pimpri Chinchawad (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹27,183 – ₹1,50,076 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pimpri Chinchwad Municipal Corporation
Municipal Corporation
Building Permit
Survey no. SURVEY NO 113 4
The promised possession date (31 Jul 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pimpri Chinchwad Municipal Corporation
Municipal corporation
Has approved 1,391 RERA projects — about 1 in 14 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,086 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,795 projects the radar draws within 6 km — every kind, every stage — 614 are residential projects still under way. This list keeps only those, and looks further out.
10 projects within 1 km — showing the nearest 6.
170 m awayResidential / Group Housing
PANOREEVA GREENS
AVIRAT DEVELOPERS · Pimpri Chinchawad · Haveli
3 yr 11 mo
Jan 2025registered
Dec 2028target completion
Government Guidance Rate₹58,077/sq ydScale144 flatsAuthorityMahaRERA