Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
493 units across 9 batches
TypeArea sq mCount
1 RK1,703136
1 BHK1998
5 RK65532
5 RK49923
1 RK1008
1 RK1,72995
1 RK1298
1 RK1248
1 RK2,667175
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Mira-Bhayandar (M Corp.)
Taluka
Thane
District
Thane
Pincode
401107
Survey no.
Survey Number 19/1, 19/2, 19/3, 19/4 and Survey number 93
North boundary
Survey number 16
East boundary
Survey number 193
South boundary
Survey number 18
West boundary
Survey number 20 and Survey number 22
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 876m away · Clinic within 2km
LifestylePark 1.0km away
ShoppingSupermarket 981m away · Mall 1.4km away
Getting around
Expressway 586 m · Western Express HighwayPrimary road 669 m · Mira Bhayandar RoadRailway line 3.1 km · Western Railway Virar to BorivaliMetro station 682m away (Kashigaon)Bus stop within 500m
Water & environment
Water body 473 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Mira-Bhayandar (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000055258
25 Sep 2021
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,916 residential projects still under way within 25 km. Step out ring by ring:
Of the 865 projects the radar draws within 6 km — every kind, every stage — 315 are residential projects still under way. This list keeps only those, and looks further out.
24 projects within 1 km — showing the nearest 6.
120 m awayResidential / Group Housing
UNIQUE ELANZA
UNIQUE STAR DEVELOPERS LLP · Mira-Bhayandar · Thane
4 yr 10 mo
May 2022registered
Mar 2027target completion
Government Guidance Rate₹60,034/sq ydScale345 flatsAuthorityMahaRERA